Jump to content

dave68

One SeaGate 411'
  • Joined

  • Last visited

Everything posted by dave68

  1. http://www.groupplan.org/project-overview/. The group plan commission website has been updated. This includes the public square redesign...mall enhancements....bridge to lakefront. Great videos and once again comments and creative input suggested. I still am confused whytheexcess funds from the convention center were not automatically put towards the mall upgrades or the bridge tithe lakefront. At his point shouldn't tequayer cent county sales tax be extended for public space improvements in Cleveland
  2. freethink. I did the same thing!
  3. http://www.cuyahogacounty.us/en-US/earthcam.aspx earthcam construction site
  4. I came across this image of the proposed exterior lighting for The Westin. I haven't seen this before
  5. I like the nautical flags spelling Cleveland.
  6. I agree that the skywalk to the Breuer tower made sense. I don't understand why they nixed the walk thru to the entire site.
  7. Will the plan Land-studio.org drafted be dropped as an option? I included a link to see the concepts http://www.land-studio.org/projects/wendy-park-redesign
  8. Clevelanders be proud of our city wherever you may live. This brought tears to my eyes. A part of downtown which was so close to becoming a parking lot and the magnificence I believed was always there. Cleveland is back and better than ever. Visionary opening to an enhanced district.
  9. The exterior signage is horrible. Why not incorporate the sign into the existing square cutout with just a 9 and no background?
  10. a photo found online of the almost completed chandelier lit. I am excited to see the entire district lit on May 2.
  11. Are all the buildings in The District architecturally lit? The area looks vibrant. I truly hope these improvements bring attendees out of the parking structures behind the theatres
  12. Loving it! The only improvement to suggest would be the internal structure be chrome/mirrored instead of black.
  13. 19 action news stood in front of the wrong spot. The reporter stood in front of the museum of arts and referenced the building site as the old institute of art campus. Hmmm. Very misleading/inaccurate reporting
  14. Thanks for all the photos. Beside the crystals on the chandelier, what is left to be done in the transformation in this district?
  15. The view of The Student Center proves the architectural choices by Cleveland State is bland architecture. None of these projects help to form an urban campus.
  16. http://www.newsnet5.com/news/local-news/oh-cuyahoga/playhousesquare-chandelier-frame-goes-up-friday-morning-on-euclid-avenue
  17. I am very fond of the these enhancements
  18. You really get a sense how large he chandelier is with the large video stylon and the chandelier assembly in the same photograph. Looks great
  19. I thought that rendering/block was stark enterprises not Weston
  20. The County Headquarters design misses its mark on so many levels for this site All the surrounding buildings have details which express a verticality and yet the design does everything to fight this. The slight setback for the skywalk could have had one color of glass to help . This design is suited for a suburban industrial park.
  21. Kudos to all involved in this extraordinary effort and design. The photographic journal is perfection.
  22. http://flatseast.com The website has been updated and retooled Also do you think the Ernst and Young tower will change their signage with their new logo?
  23. I wish the patina of the canopy for the Allen Theatre was cleaned up to match the new sign color above. The 2 appear disjointed. Btw thanks for all the photo updates.