
-
Cleveland: University Circle (General): Development and News
Progress on the Nord Family Greenway! Part of a new sign. Looking towards the Maltz Center. Many of the trees planted are large-growing oaks, maples or similar. The walking path straight toward the Tinkham Veale University Center. Interesting linear, architectural feature. Does anyone know if this serves a practical purpose? Path and staircase on Art Museum side. Bike path descending from E.105th St. Bike path toward Cancer Survivor's Plaza area / CMNH. Doan Brook exit + new bridge / overlook. Former location of CMA maintenance facility. In the distance is the CMA + NEORSD project to re-route + stabilize + naturalize Done Brook beneath the Museum's embankment.
-
Cleveland: Downtown: nuCLEus
From the video, the meeting is scheduled to start at 6:30pm tonight. No word yet on the result of the vote! Edit: Just noticed this was 6:30pm *last* night (Sept. 13). No info that I can find --- perhaps the school board did not in fact meet or vote last night.
-
Cleveland: Cleveland Museum of Art Expansion / Renovation
The Art Museum has completed a major renovation of its ArtLens Gallery (encompassing what was formerly known as Gallery One, Studio Play, and the Collection Wall) with new touchless interactive experiences. Read more on the museum's website: http://www.clevelandart.org/artlens-gallery/about. A photo from the recent MIX event (Sept. 8, 2017), when the newly-renovated gallery opened to the public:
-
Cleveland: Downtown: Mall Development and News
There is some construction fencing up an the east side of Key Tower and some of the granite pavers have been removed. Could this be the landscaping project described earlier in this thread? (Sept. 12, 2017)
-
Cleveland: Public Square Redesign
Concrete planters are now painted green AND filled with plants! (Baby steps...)
-
Cleveland: Downtown: The Beacon
A view of the crane construction from a few days ago (Tues. Sept. 12, 2017), in which we can see the tower crane sections up close.
-
Cleveland: Lakefront Development and News
Construction fencing up around the site for Harbor Verandas. (Sept. 12, 2017)
-
Cleveland: University Circle (General): Development and News
Nord Family Greenway on Saturday, June 3. More construction fencing is up, much of the land has been reshaped, and significant cement work at the Doan Brook culvert is finished. Looking South along MLK Blvd. Regrading the land below the Maltz Center. Looking East towards the Art Museum. Much brush has been cleared from this area. Work on the Doan Brook Culvert. Detail of work at Doan Brook culvert. Land grading, looking East toward the CMA. Looking SE, University Hospital visible in distance.
-
Cleveland: Opportunity Corridor Boulevard
Here are some views of the work occurring at E105 and Quincy Ave. as of this past weekend. The entire intersection has been brought down to the road base and we can see that some amount of grading work has been done for the new-construction section of the boulevard. Looking South at the Intersection of Quincy Ave and E105 on Saturday, June 10, 2017. Looking W. on Quincy Ave at same intersection. Due West view on Quincy Ave.
-
Cleveland: One University Circle
Some images of One University Circle, from some new angles. (Taken Saturday, 10 Jun 2017.) View from southern end of Wade Lagoon. (10June2017) View from Strearns Rd. (10June2017) View from Deering Ave., looking West. (10Jun2017) Ground floor facade and parking levels detail. (10Jun2017) One University Circle and John Hay School across Deering Ave. from each other. View from North corner of project site, on Euclid Ave. View from the West, with PNC Bank drivethrough in foreground. Detail of western aspect.
-
Cleveland: One University Circle
A photo taken today, showing a side view of the growing tower.