Jump to content

Firenze98

Great American Tower 665'
  • Joined

  • Last visited

Everything posted by Firenze98

  1. Yeah I don't get what is the rush. This should be reviewed with no time constraints. "I regret we have 5 minutes to make a motion and haven't even talked about the tower" WTF.
  2. Here's a start. https://www.clevelandskyscrapers.com/unbuilt-cleveland-skyscrapers Ferrari Tower Courthouse Plaza
  3. Same here. The Architect in me was hoping for something more iconic instead of this mirrored wedge crown.... Something like the form in this light bollard would have been badass. Of course I'm excited to get a new tower in downtown and that the windswept parking lots with trashnados (KJP term) are being eliminated.
  4. Ha still Tri-Towers for me too. I was in Koonce Hall for a bit.
  5. That may just work for me as well.
  6. Agree and I can't wait for this last piece of the Main and Main to have new life. Is there anything NOT to love about this intersection. If you would have told me 15 years ago this intersection would look like the photo below and Huntington on its way, I'd thought you were crazy.
  7. Purely based on the massing, I am not in favor of that design. It looks like a giant ice cream sandwich with two angle ends. To me it seems too disjointed with the angles going in opposite directions. Hopefully the choice of exterior materials will help improve the look, as I agree with MRNYC, materials can greatly change the look.
  8. Same here. I can only refresh NEO-Trans Blogspot so many times in a day before I give up 😄
  9. The other odd thing is that the Coffee/Cafe has an opening in the second floor that could be viewed down from another use if that space is leased.
  10. Totally agree! There should be some material overlap to tie the two together. Just because they are different uses doesn't mean they have to look completely different. It's like the top portion was added on to a building built 20 years ago.
  11. Wow that Medical Mart... er Global Center for Health Innovation Center sure has changed...
  12. Those buildings remind me of some of the Dutch waterfront buildings
  13. LOL. Agree! Instead of a Woj-bomb (Adrian Wojnarowski) we get a NEO-Trans Bomb. I find myself checking NEO Trans daily to look for the latest trade speculation...I mean CLE development updates.
  14. So we essentially are still left with a wasteland in terms of street activity separating the Warehouse District from Public Square...sheesh. Most employees will park at the garage with direct access to the buildings, including the bridge. I know the north half of the property is planned to be developed to cut down on that wasteland, but a bit of a let down. Man do I wish the Weston development had moved forward! I'm certainly not dismissing the impact of retaining all the SW jobs in Cleveland, but we all wanted more. I guess the most likely way we would have gotten street level public amenities is if a developer built a skyscraper and SW was the major tenant?
  15. Que sound of Pac-Man dying
  16. http://neo-trans.blogspot.com/ now in constant refresh mode....
  17. More often than not, it's cheaper to build new. Trying to build within an existing old structure is difficult and you don't have the added demolition costs. Also, this building is more spread out compared to the more vertical Lumen, where its more cost effective to stack utilities etc. I'm also guessing that cost includes a hefty contingency line item to deal with unknowns or surprises during construction.
  18. Kohn Pedersen Fox has always been a favorite of mine. Would love to see something like their supertall designs, but on a smaller scale obviously for this tower. Pickard Chilton is just as edgy in their designs so I'm excited to see what they come up with. https://www.kpf.com/projects/type/supertall
  19. Don't disagree with those statements either.
  20. Agree that no contractors have been selected yet as the project is many months if not a year away from bidding. As for the engineering team, that's not entirely true all the time. Usually when an Architect submits a proposal or responds to an RFQ, they already have their design team (engineers, third party estimators, etc) already on board or established behind the scenes. The entire design team is not necessarily announced along with the architect. It is possible the design team isn't established yet as you mention, but from my experience the team is usually already formed.
  21. My 5 year old and I worked on a new SW HQ massing.
  22. My attempt at the fourth tower during my third year's Kent State architecture program.....22 years ago..eek. I'd go for something that height however.