Prayers for 3rd Ave and Goodale traffic.

 

It's actually not bad compared to 5th which is just a cluster.

  • Replies 589
  • Views 55.4k
  • Created
  • Last Reply

Top Posters In This Topic

Most Popular Posts

  • BroadGayLongSt
    BroadGayLongSt

    Longtime lurker, first time poster here. I don't have photo posting privileges yet, but here is some helpful info on the Tri-W development/Grandview Yard south expansion including site plans and conce

  • PrestoKinetic
    PrestoKinetic

    Here are some drive-by pics of The Devon. It's got a lot of progress! Definitely has some presence from the North.        

  • Across 1st Ave/1st Ave Park from the Devon is Grandview Yard Block J.   $111.5 million 390 apartments 500+ car garage Amenity commercial along Yard Constructio

Posted Images

Drove down Yard St yesterday, looks like foundation work is starting on the Manchester building. Kinda strange their hasn't been any official announcement yet ...

Prayers for 3rd Ave and Goodale traffic.

 

It's actually not bad compared to 5th which is just a cluster.

 

I meant...when all these GV Yard projects start getting completed.  But yeah, the main road to be hit will probably be Olentangy River Rd.  Already a cluster, and adding in that many more cars off of the 315 exits.

Very Stable Genius

Looks like improvements to the 315 off ramp, Olentangy River Road, Goodale are coming. From the Grandview Heights site: http://www.grandviewheights.org/CivicAlerts.aspx?AID=546

 

Tuesday, September 6, 2016 at 5:30 p.m. the City of Grandview Heights Administration will hold a public meeting in Council Chambers, 1016 Grandview Avenue, to seek public comment on a grant/loan application to the Ohio Public Works Commission for work in the vicinity of Goodale Boulevard and Olentangy River Road. The proposed project will make improvements to the SR 315 Off Ramp and improvement to the intersection of Olentangy River Road/Goodale Boulevard/Twin Rivers Drive. The proposed project is located within the Grandview Yard TIF Site and was identified as a needed off-site improvement at the start of the Grandview Yard redevelopment project

Is it the northbound 315 ramp, the southbound or both?

Years ago I was involved in a project that calculated that an underpass beneath the railroad was possible grade wise (immediately west of the 315 southbound off-ramp). It was costly. Probably a little late now considering the improvements already constructed in Grandview Yard.

Work Starting on New Five-Story Building at Grandview Yard, Condo Units Selling

 

manchester-01.jpg

 

Construction is underway on the latest new addition to Grandview Yard — a mixed-use building featuring ground-level retail with four floors of apartments above.

 

The new building, to be called the Manchester, is located at the southeast corner of Yard Street and Junction Way. Parking will be available in a large garage just to the east, which also serves office workers in the new Nationwide Corporate Campus. As many as 3,000 Nationwide employees will eventually work in the development.

 

More below:

http://www.columbusunderground.com/work-starting-on-new-five-story-building-at-grandview-yard-condo-units-selling-bw1

"You don't just walk into a bar and mix it up by calling a girl fat" - buildingcincinnati speaking about new forumers

  • 1 month later...
  • 2 months later...

Grandview Yard-adjacent news...

 

Grandview asking for bids on $1.85M improvements to Goodale Boulevard

 

goodale-grandviewjpg*750xx4032-2268-0-378.jpg

 

Grandview Heights is planning improvements to a key thoroughfare into downtown Columbus.

 

More below:

http://www.bizjournals.com/columbus/news/2017/01/04/grandview-asking-for-bids-on-1-85m-improvements-to.html

"You don't just walk into a bar and mix it up by calling a girl fat" - buildingcincinnati speaking about new forumers

Third Avenue by Grandview Yard finally getting sidewalks

 

grandview-yard-construction*750xx2740-1542-0-520.jpg

 

Traffic along West Third Avenue by Grandview Yard will be impacted for months as the city resumes work on the last major public improvements for the development.

 

That means sidewalks are coming to an area that is increasingly congested.

 

More below:

http://www.bizjournals.com/columbus/news/2017/01/10/third-avenue-by-grandview-yard-finally-getting.html

"You don't just walk into a bar and mix it up by calling a girl fat" - buildingcincinnati speaking about new forumers

A big problem around Grandview and 5XNW is that too many manholes are sunken. That makes manholes like potholes. It's definitely true on Goodale near Grandveiw Yard.

  • 1 month later...

Work Starting on New Five-Story Building at Grandview Yard, Condo Units Selling

 

manchester-01.jpg

 

Construction is underway on the latest new addition to Grandview Yard — a mixed-use building featuring ground-level retail with four floors of apartments above.

 

The new building, to be called the Manchester, is located at the southeast corner of Yard Street and Junction Way. Parking will be available in a large garage just to the east, which also serves office workers in the new Nationwide Corporate Campus. As many as 3,000 Nationwide employees will eventually work in the development.

 

More below:

http://www.columbusunderground.com/work-starting-on-new-five-story-building-at-grandview-yard-condo-units-selling-bw1

 

So there is a pretty significant below grade foundation being poured directly across the street from the Manchester and Nationwide.  Will this be another Nationwide occupied building?  I don't see any mention of it anywhere.

Work Starting on New Five-Story Building at Grandview Yard, Condo Units Selling

 

manchester-01.jpg

 

Construction is underway on the latest new addition to Grandview Yard — a mixed-use building featuring ground-level retail with four floors of apartments above.

 

The new building, to be called the Manchester, is located at the southeast corner of Yard Street and Junction Way. Parking will be available in a large garage just to the east, which also serves office workers in the new Nationwide Corporate Campus. As many as 3,000 Nationwide employees will eventually work in the development.

 

More below:

http://www.columbusunderground.com/work-starting-on-new-five-story-building-at-grandview-yard-condo-units-selling-bw1

 

So there is a pretty significant below grade foundation being poured directly across the street from the Manchester and Nationwide.  Will this be another Nationwide occupied building?  I don't see any mention of it anywhere.

 

I know a third nationwide building is going in right across yard St from "H" building and southern garage. I believe it's going to be around 100,000sf. Is this the foundation you are thinking about? Also a 3rd ~1200 car parking garage is going in around there.

 

It's a pretty good size foundation they are working on, if it's just a garage kinda strange they would be doing underground parking when they wouldn't need to. It's also looks a bit big for a 100,000sf building and the placement is off from where the 3rd nationwide building is being proposed.

  • 4 weeks later...

The 135-room Courtyard by Marriott Hotel and The Grand Event Center neighboring the hotel are now open.  Below is a streetscape view taken at the corner of Goodale Boulevard and Yard Street:

 

33798867566_b8bd85ae4c_b_d.jpg

 

Below are a few finished photos of the hotel and event center from http://www.grandviewyard.com/hotels-and-event-center/courtyard-by-marriott/ and also from http://www.grandviewyard.com/hotels-and-event-center/the-grand-event-center/:

 

MARRIOTT HOTEL - rear auto court:

33710125951_47230b9a94_b_d.jpg

 

 

OUTDOOR SPACE BETWEEN HOTEL AND EVENT CENTER:

33839370735_809458a62c_c_d.jpg

 

 

THE GRAND EVENT CENTER:

33454916890_c9d719c655_b_d.jpg

33026007433_a649779d92_b_d.jpg

My office literally overlooks much of the constructions, and yesterday many of the steel beams were delivered.  Today they have done all of this framing up pretty quickly!  Will be interesting to see how fast this comes together at this stage!

  • 3 months later...
  • 1 month later...

Lots of Grandview Yard updates today from http://www.columbusunderground.com/construction-continues-at-grandview-yard-development:

 

The Manchester - a five-story, 115-unit apartment building with ground-floor retail built in front of a parking garage that serves the Nationwide Corporate Campus - is wrapping up its construction:

construction-sept-2017-33.jpg?resize=1024%2C630

 

 

And speaking of the Nationwide Corporate Campus, two photos updating its next construction phase:

construction-sept-2017-34.jpg?resize=1024%2C630

 

construction-sept-2017-37.jpg?resize=1024%2C630

 

 

-- The final two updates are the for-sale homes at Pullman Way and a new Chick Fil-A location facing Third Avenue - photos available at http://www.columbusunderground.com/construction-continues-at-grandview-yard-development

  • 1 month later...

Looks like a 4 or 5 story building is under construction at Yard and Williams. I went for a run today through the grandview yard and saw stairwells being built out next to the under construction Nationwide building. Looks like it's probably apartments with maybe commercial on the first floor. It doesn't look like the stairwells are apart of the new Nationwide building or the new parking garage.

  • 3 weeks later...

More Office and Retail Coming to Grandview Yard

 

Nationwide Realty Investors (NRI) has announced the latest new addition to Grandview Yard – a two-story, 32,000-square-foot building which will hold office and retail users. The new building will be located at the northwest corner of Yard Street and Junction Way.

 

Groundbreaking is scheduled for January, with the first tenants scheduled to move in sometime in the fall of 2018.

 

More below:

http://www.columbusunderground.com/more-office-and-retail-coming-to-grandview-yard-bw1

 

timthumb.php?src=http%3A%2F%2Fwww.columbusunderground.com%2Fwp-content%2Fuploads%2F2017%2F11%2FGrandviewYard_1125Bldg-view-looking-northwest.jpg&q=90&w=650&zc=1&

"You don't just walk into a bar and mix it up by calling a girl fat" - buildingcincinnati speaking about new forumers

Two stories?  Meh.

Very Stable Genius

Two stories?  Meh.

 

It "fits" with that section of the development; I don't mind it as it means another lot is filled.

 

 

Also I'm curious about a few things:

 

 

1. No word on the former HealthSouth lot on Goodale(labelled in yellow)

 

 

2. Apartment demand should be high enough to build the large yellow label, what's the word on that?

 

 

3. Will Wagenbrenner completely takeover the red labelled section and create a transition into the neighborhood?

 

 

C:\Users\lh078\Desktop\2016-Grandview-Yard-Master-Plan-with-Labels.jpg

2016-Grandview-Yard-Master-Plan-with-Labels.jpg.f944f091e7a7793fc9dafa036fc3a554.jpg

Re: #3, I used to live directly to the west of the far right hexagon.  There is (was?) still a business or two operating in some of those old warehouse type buildings.  I was hoping I could stick it out to enjoy the entirety of GV Yard and be able to just walk over there (I did all the time to the Giant Eagle) but I decided I needed to get some equity rather than losing everything to rent.

 

That 3rd Ave stretch under the rail road tracks is terrible for bikers and pedestrians.  I know they have a plan to eventually shore that up, but man that's such an awful stretch.

Very Stable Genius

Re: #3, I used to live directly to the west of the far right hexagon.  There is (was?) still a business or two operating in some of those old warehouse type buildings.  I was hoping I could stick it out to enjoy the entirety of GV Yard and be able to just walk over there (I did all the time to the Giant Eagle) but I decided I needed to get some equity rather than losing everything to rent.

 

That 3rd Ave stretch under the rail road tracks is terrible for bikers and pedestrians.  I know they have a plan to eventually shore that up, but man that's such an awful stretch.

 

That warehouse you lived by is now gone, everything in the "hexagon" area is being demolished and graded for development.

 

The shoring is up on third getting ready for the new bridge to eventually create the sidewalks on 3rd finally.

  • 3 weeks later...

So definitely another apartment building going up next to Nationwide's expansion... also curious to see what is going to happen on the two lots on the west end.. a lot of dirt is being moved there right now

IMG_0356.jpg.20127ab99eb445947432204b0cfadd6c.jpg

IMG_0355.jpg.eea60eb8e7bfc062fedee76130b4f683.jpg

IMG_0353_1.jpg.6571b2617ce775f8f6868fbdaeeff12e.jpg

  • 1 month later...

CU has some more Grandview Yard construction photos.  These were posted Nov. 30 at http://www.columbusunderground.com/construction-roundup-november-2017-part-2

 

The above link has multiple pics of single-family and multi-family buildings under construction in the Pullman Way section.

 

The 828 at the Yard condo building looks complete.  Project website is https://www.828attheyard.com/

construction-roundup-2017-nov-43.jpg?resize=1300%2C800

 

While construction continues in and around the Nationwide Corporate Campus:

construction-roundup-2017-nov-40.jpg?resize=1300%2C800

  • 1 month later...

The unannounced apartment building continues to come along nicely. Also the two office buildings next door for Nationwide's campus are just about done. The Manchester building apartments are occupied, but no sign of any ground floor tenants yet. And Chick Fil A is complete as well

 

lNjbOcE.jpg

  • 2 weeks later...

More Office and Retail Coming to Grandview Yard

 

Nationwide Realty Investors (NRI) has announced the latest new addition to Grandview Yard – a two-story, 32,000-square-foot building which will hold office and retail users. The new building will be located at the northwest corner of Yard Street and Junction Way.

 

Groundbreaking is scheduled for January, with the first tenants scheduled to move in sometime in the fall of 2018.

 

More below:

http://www.columbusunderground.com/more-office-and-retail-coming-to-grandview-yard-bw1

 

timthumb.php?src=http%3A%2F%2Fwww.columbusunderground.com%2Fwp-content%2Fuploads%2F2017%2F11%2FGrandviewYard_1125Bldg-view-looking-northwest.jpg&q=90&w=650&zc=1&

 

Work has officially started on this project.

  • 2 weeks later...

Grandview Yard filling in nicely. Also a "before" for the White Castle property:

 

25672504447_16e592561e_o.jpg

  • 1 month later...

Sidewalk/site prep work is being done on the east side of Yard St. and the building going up looks much larger than I expected.

IMG_0556.JPG.4203fe8ef85c93a54b04f85908e92cb0.JPG

  • 3 weeks later...

https://www.columbusunderground.com/two-new-apartment-buildings-under-construction-at-grandview-yard-bw1

 

CU posted a report (linked above) about two new buildings under construction at Grandview Yard.  The previously unannounced project – now dubbed the Dorchester – consists of two four-story apartment buildings that will bring the total number of residential units in the Grandview Yard mixed-use development to over 800.

 

The first building of the pair - Dorchester East - will be ready for its first residents by July.  It is located at the northwest corner of Yard Street and Williams Avenue and contains 86 apartments.

Dorchester-4.jpg?resize=1024%2C630&ssl=1

 

 

Work began in March on the second apartment building - Dorchester West - which sits directly behind the first one.  It will have 150 units and is scheduled to be completed by next summer:

Dorchester-5.jpg?resize=1024%2C630&ssl=1

 

 

Both buildings will be connected via tunnel to an existing four-story parking garage, which is also utilized by Nationwide employees working in one of the four office buildings clustered along Yard Street.  With a final group of office workers moving in last week, the total count of Nationwide employees at Grandview Yard is now up to 4,000:

Dorchester-8.jpg?resize=1024%2C630&ssl=1

 

 

The new apartments mark the fifth development phase at Grandview Yard.  The first phase was completed in 2010, when Hyatt Place Columbus, Planet Fitness and other businesses opened on the southern edge of the site near Goodale Boulevard.  The project developer, Nationwide Realty Investors, declined to provide any details about plans for filling out the remainder of the 90-acre site, but did say that the goal is to have a total of 1,500 residential units at Grandview Yard by the time the final development phases are completed:

Dorchester-7.jpg?resize=1024%2C630&ssl=1

 

More info and photos at https://www.columbusunderground.com/two-new-apartment-buildings-under-construction-at-grandview-yard-bw1

  • 2 weeks later...

Some more Grandview Yard residential projects from https://www.columbusunderground.com/construction-roundup-grandview-yard-may-2018-we1

 

The recently completed Manchester building with 123-units of residential and ground-floor retail at this corner:

cons-gvy-may-2018-07.jpg?resize=1024%2C630&ssl=1

 

 

The Yard Club was built as an amenity space for all the Grandview Yard residents:

cons-gvy-may-2018-09.jpg?resize=1024%2C630&ssl=1

 

 

The Yard Club was built next to the 166-unit Brooks apartment building:

cons-gvy-may-2018-08.jpg?resize=1024%2C768&ssl=1

 

 

At the western edge of Grandview Yard - next to the previously existing homes of Grandview Heights - is the Homes at Pullman Way section.  Below is a view of the nearly completed first-phase of this 84-home section:

cons-gvy-may-2018-13.jpg?resize=1024%2C630&ssl=1

 

Some of the Homes at Pullman Way are single-family detached homes, while others will be attached dwellings:

cons-gvy-may-2018-15.jpg?resize=1024%2C630&ssl=1

 

And some residences in the Homes at Pullman Way section will be multi-story townhomes:

cons-gvy-may-2018-16.jpg?resize=1024%2C630&ssl=1

Some non-residential Grandview Yard projects from https://www.columbusunderground.com/construction-roundup-grandview-yard-may-2018-we1

 

The 1125 Yard Street office/retail building is under construction down the street from the Manchester building:

cons-gvy-may-2018-06.jpg?resize=1024%2C630&ssl=1

 

 

One of the Nationwide Insurance office buildings and parking garages built in Grandview Yard.  Construction trailers sit on a future development site facing Yard Street.  (The building seen over the parking garage is one of the office buildings built on the Gowdy Field landfill redevelopment site along Olentangy River Road and is not part of the Grandview Yard development.):

cons-gvy-may-2018-19.jpg?resize=1024%2C630&ssl=1

 

 

View of the Third Street railroad viaduct construction.  The railroad viaduct is being widened to allow new sidewalks to be installed along Third Street:

cons-gvy-may-2018-05.jpg?resize=1024%2C630&ssl=1

  • 3 months later...

Looks like Grandview Yard is growing to the south. The WW Williams redevelopment that previously announced several months appears to be growing in scope. While it isn't completely clear if it's NRI or another developer, there is a new $15 million TIF that is going through negotiations to expand Bobcat and Yard streets south of Goodale and connect it to a expanded swain street that will also extend into Twin Rivers drive.

 

Tentative plans for site include 400 residential units, a hotel and potentially commercial office space.

 

y4mcR1axOuEMOgJ8a-dZvvXhHjyWhbvFNAH6JfpHg069SsN5F5quUDYitmtcKQqa6t_ymvJd994hPhVkf1hc66EbPlkxKthx-W97Z4YW5sCTb5Edc2I2Fq6lOZHrdwrX9YhGjZAWdufnkISLcVV7MreDxRQ_AM0b7doViJLudJcL9l7iIkB-u4nO7udsdvZa_oIUwKR8Y3hYTxtaNGCITTaCQ?width=540&height=960&cropmode=none

 

y4mk1gR06Q1Jd-251QSPCgJxPQqmZTzBxz0veydKXV9v_dK6vvG0ii5LCP7s8Y3xWJMvbzRU1L_C_d7pE42l4t1YnYIFONgA97PY34MB8SqWSv15-dtmIStGlQQr1nJwpMSvZ5LaZ1E18jh4jhq2kbidshXutKSyYPMIWGFWLYOUfZXobIip3IGulzq4meg0DPtrTgvzsiN7TYv2kCkhcfIVQ?width=540&height=960&cropmode=none

Wow, that is big news.

"You don't just walk into a bar and mix it up by calling a girl fat" - buildingcincinnati speaking about new forumers

400 residential units is quite a bit in the relatively small area, especially when you will also have a hotel and office space. Maybe we will actually get something over 5-stories.

Looks like Grandview Yard is growing to the south. The WW Williams redevelopment that previously announced several months appears to be growing in scope. While it isn't completely clear if it's NRI or another developer, there is a new $15 million TIF that is going through negotiations to expand Bobcat and Yard streets south of Goodale and connect it to a expanded swain street that will also extend into Twin Rivers drive.

 

Tentative plans for site include 400 residential units, a hotel and potentially commercial office space.

 

y4mcR1axOuEMOgJ8a-dZvvXhHjyWhbvFNAH6JfpHg069SsN5F5quUDYitmtcKQqa6t_ymvJd994hPhVkf1hc66EbPlkxKthx-W97Z4YW5sCTb5Edc2I2Fq6lOZHrdwrX9YhGjZAWdufnkISLcVV7MreDxRQ_AM0b7doViJLudJcL9l7iIkB-u4nO7udsdvZa_oIUwKR8Y3hYTxtaNGCITTaCQ?width=540&height=960&cropmode=none

 

y4mk1gR06Q1Jd-251QSPCgJxPQqmZTzBxz0veydKXV9v_dK6vvG0ii5LCP7s8Y3xWJMvbzRU1L_C_d7pE42l4t1YnYIFONgA97PY34MB8SqWSv15-dtmIStGlQQr1nJwpMSvZ5LaZ1E18jh4jhq2kbidshXutKSyYPMIWGFWLYOUfZXobIip3IGulzq4meg0DPtrTgvzsiN7TYv2kCkhcfIVQ?width=540&height=960&cropmode=none

 

WOW!!

  • 2 weeks later...

Grandview Yard could expand its footprint

 

With new development proposed near Grandview Yard, the city of Grandview Heights is examining its existing agreements.

 

Grandview Heights is considering modifying its compensation agreement with Grandview Yard's developer, Nationwide Realty Investors Ltd. and the Grandview Heights City School District, to increase the cap on the bonds that can be issued for projects there.

 

The proposal would add 14 acres south of Goodale Boulevard to Grandview Yard.

 

More below:

https://www.bizjournals.com/columbus/news/2018/09/12/grandview-yard-could-expand-its-footprint.html

 

aerial-image-with-1125-bldg-render*1200xx3429-1929-86-0.jpg

"You don't just walk into a bar and mix it up by calling a girl fat" - buildingcincinnati speaking about new forumers

Oh damn, I actually didn't see that coming

Grandview Yard could expand its footprint

 

With new development proposed near Grandview Yard, the city of Grandview Heights is examining its existing agreements.

 

Grandview Heights is considering modifying its compensation agreement with Grandview Yard's developer, Nationwide Realty Investors Ltd. and the Grandview Heights City School District, to increase the cap on the bonds that can be issued for projects there.

 

The proposal would add 14 acres south of Goodale Boulevard to Grandview Yard.

 

More below:

https://www.bizjournals.com/columbus/news/2018/09/12/grandview-yard-could-expand-its-footprint.html

 

aerial-image-with-1125-bldg-render*1200xx3429-1929-86-0.jpg

 

Did they finally finish the work at the RR bridge? Do the sidewalks connect yet?

 

Did they finally finish the work at the RR bridge? Do the sidewalks connect yet?

 

That aerial is probably over one year old. It's missing several under construction and even completed buildings. Also, 3rd Ave has been one way westbound for at least six months now for the RR bridge construction.

^ If you look closely that 'aerial' is actually a rendering for the two-story office building on Yard St, at center, which is now under construction