April 11, 201510 yr My contribution to this photo-documentary (OK, more like a drive-by shooting).... "In the souls of the people the grapes of wrath are filling and growing heavy, growing heavy for the vintage." -- John Steinbeck
April 11, 201510 yr I see they've hired an interior designer that has no understanding of how to design within the styles of the building. Unnecessary curves are a signature of a mediocre interior designer. Where is the eyeroll emoticon?
April 12, 201510 yr ^ I don't think jmicha is wrong, but I also don't think that I expected anything more from this building (and more specifically, this architectural firm).
April 12, 201510 yr I see they've hired an interior designer that has no understanding of how to design within the styles of the building. Unnecessary curves are a signature of a mediocre interior designer. Where is the eyeroll emoticon? It would cheapen my distaste for interior designers that can't work in conjunction with a building. PSA: This isn't a knock on interior designers in general. There are so many out there that heighten the design of a building or space and do things I could never do. But for every good one there are five "decorators" masquerading as interior designers. That's how you wind up with curves in a building that has no curves.
April 12, 201510 yr This is a convention center hotel this design exceeds my standards for them, i think it's pretty good for the type of hotel being built.
April 13, 201510 yr It appears the glass curtain wall has begun to be installed along the mall side's podium base http://www.cuyahogacounty.us/en-US/earthcam.aspx
April 13, 201510 yr In addition to the project's $272 million budget, the county could access a $4 million contingency fund for design changes or additions, plus an additional $34 million set aside to compensate for risks including bad weather or labor issues, Appelbaum said. http://www.cleveland.com/architecture/index.ssf/2015/04/hilton_downtown_cleveland_conv.html Ahem.... http://www.urbanohio.com/forum2/index.php/topic,17673.msg752446.html#msg752446 "In the souls of the people the grapes of wrath are filling and growing heavy, growing heavy for the vintage." -- John Steinbeck
April 17, 201510 yr Already a third of the way up. "In the souls of the people the grapes of wrath are filling and growing heavy, growing heavy for the vintage." -- John Steinbeck
April 18, 201510 yr Its going to be a lot shorter than I thought if it's already a third of the way up.
April 18, 201510 yr It looked pretty impressive to me in person. And after seeing it, the photos do it justice. "In the souls of the people the grapes of wrath are filling and growing heavy, growing heavy for the vintage." -- John Steinbeck
April 18, 201510 yr I really like how the podium is coming together despite some of the changes. The large expanse of glass and the color of the concrete panels look very nice. It really makes a bold statement on that corner and will bring a lot of light and activity to the mall. So far 2 thumbs up.
April 21, 201510 yr I never have been a fan of the angled window jut out. It has no relationship to the Malls or the building itself. The transparency of the structure through the glass is an interesting decision by architects. I prefer not to see the concrete.
April 21, 201510 yr I'm going to have to say the opposite, I'm happy they went with more transparent glass. It gives buildings a sense of volume whereas reflective glass ends up looking extremely flat. I also like the structure of a building being visible to the exterior. I generally find the lack of celebration of structure in most buildings unfortunate since structural expressionism can result in some really great spaces and buildings. Curtain walls kind of spit in the face of this idea generally so it's nice to be able to see beyond this curtain wall.
April 21, 201510 yr Will you be able to see the concrete through the glass... Or is it only visible now because the studs and drywall that would normally wrap such structural elements haven't been built yet because this building is still under construction?
April 21, 201510 yr In the base it appears that the columns will be exposed. In the upper floors they'll likely be wrapped with stud framing and drywall. But the transparency will remain in the upper floors which is good. The structural exposure will likely only exist in the base.
April 21, 201510 yr I believe they get a column cover of probably aluminum or other material. https://www.instagram.com/cle_and_beyond/https://www.instagram.com/jbkaufer/
April 21, 201510 yr I never have been a fan of the angled window jut out. It has no relationship to the Malls or the building itself. The transparency of the structure through the glass is an interesting decision by architects. I prefer not to see the concrete. The angled window jut out echoes the jut out of the building at the top, so it relates to the building. I think it is a clever idea on the part of the architects. And I totally agree with preferring to not have a transparent glass skin. I think buildings look so much better with reflective glass and not being able to see into the building through the glass. I know others disagree, but that is my view. These "little 9 foot floors" are going up fast. There is visible progress almost every day now.
April 23, 201510 yr I'm going to have to say the opposite, I'm happy they went with more transparent glass. It gives buildings a sense of volume whereas reflective glass ends up looking extremely flat. I also like the structure of a building being visible to the exterior. I generally find the lack of celebration of structure in most buildings unfortunate since structural expressionism can result in some really great spaces and buildings. Curtain walls kind of spit in the face of this idea generally so it's nice to be able to see beyond this curtain wall. -Exactly! I notice as I occasionally check the updates that this building has rather handsome concrete formwork and I am glad it is not hidden like in 95% of buildings (or every other building in Clevo). Also, anyone else notice that this building makes the Justice Center look a lot less ugly? I wonder how it will look with the Federal Building across the mall (w/ both the Hilton and Fed glad in glass)...
April 23, 201510 yr I like the Feds new look. Coming from the west on the shoreway it looks great. Gives it a modern look IMO.
April 23, 201510 yr Landmark Planning Commission agenda for April 23 regarding landscaping and lighting. http://planning.city.cleveland.oh.us/landmark/agenda/2015/04232015/index.php The interesting note is parking located in the Huntington Parking Structure 500 assigned spaces. 250 for self park and 250 for valet. Also this image appears to have possible added design features considered for The Malls
April 26, 201510 yr It is very impressive how fast the glass curtain wall has been going up. From the earth cam images it appears the podium glass along the mall side is halfway installed. http://www.cuyahogacounty.us/en-US/earthcam.aspx
April 27, 201510 yr This photo is from Donley's construction facebook. It looks like it's from a webcam as it is time stamped. So there might be another construction cam out there but I can't find the link.
April 29, 201510 yr So, why are we not seeing the "porch" on the mall side or the parallel overhanging roof on the podium side, above the Lakeside entrance indentation? Those were a pretty important part of the rendered design, and I can't see any evidence that they are going to exist.
April 29, 201510 yr ^This issue was discussed at length about a month ago in this thread. If you check back a few pages you should find some answers.
April 29, 201510 yr ^ Actually, while the removal of the Lakeside balcony was discussed to death, there was only a very brief discussion (and no resolution) of the overhanging roof issue, nor, IIRC, any discussion of the mall porch at all; both of which are pretty important to the overall design.
April 29, 201510 yr ^ No, we discussed the Lakeside side, not the Mall-facing side, which is what gruver is talking about. The Mall-facing side actually never called for a "porch" - at least nothing like what was initially planned for the Lakeside side. There is a small porch for the Mall side, and you can see that in the photos (the little bit that juts out around the 3rd or 4th floor). As for the overhanging roof, I don't see why we would rule that out yet. I'd think that that would be one of the last things added.
April 29, 201510 yr There is a small porch for the Mall side, and you can see that in the photos (the little bit that juts out around the 3rd or 4th floor). Ah yes you can see the two doors above the porch. https://www.instagram.com/cle_and_beyond/https://www.instagram.com/jbkaufer/
April 29, 201510 yr The small porch along West Mall Drive was always in the design. As for the canopy, It is definitely still in the design Plans were submitted to The Landmarks Commission for lighting schematics. Also other renderings show the canopy is still planned for The Lakeside facade. The rendering does show that the porch was eliminated off of The Lakeside facade
April 29, 201510 yr ^Wow thanks! https://www.instagram.com/cle_and_beyond/https://www.instagram.com/jbkaufer/
April 29, 201510 yr ^ Thanks, dave68. From those renderings, it looks like the mall canopy and the Lakeside overhang (but not porch) are still in the picture.
April 29, 201510 yr Thanks, dave68, those renderings help clear up a lot of questions! I was initially worried when I first saw they removed the porch from the Lakeside side, but I'm happy to see that pretty much all the other architectural details are remaining the same.
April 29, 201510 yr I think this hotel is going to be beautiful. We are so lucky to not be getting a Hilton hotel like the one in Columbus. http://www.hiltoncolumbusdowntown.com/d/hcolumbus/media/__thumbs_209_119_crop/Exterior-_high_res.jpg
April 30, 201510 yr We are so lucky to not be getting a Hilton hotel like the one in Columbus. Oh, please. Haters gonna hate. They're both nice projects which are good for our state's urban areas and fit into their respective contexts. Cuyahoga County and Cleveland are putting up $265+ million in public dollars for a 600-room hotel. By contrast, Franklin County and Columbus spent $138 million for their 532-room hotel. Is it as flashy or as much of a landmark? No, but it doesn't have to be. It's neither the largest hotel in Columbus, nor does it front onto a major public space like Cleveland's mall. Also, Cleveland's Hilton is not expected to generate enough revenue to cover the debt service payments on its construction; that's okay because the county will use revenue from the convention center to further subsidize the hotel. In Columbus, revenue from the Hilton is exceeding what's necessary for it to pay it's own way on the construction debt. I don't think either project is better or worse than the other, they just reflect the realities and priorities of their contexts.
April 30, 201510 yr I don't think the one in Columbus looks bad at all. Love the varied colors and surfaces. It's upscale and classy. At the same time, I'm glad Cleveland is getting a big shiny tower near the lake. Win-win!
April 30, 201510 yr ^ Actually, while the removal of the Lakeside balcony was discussed to death, there was only a very brief discussion (and no resolution) of the overhanging roof issue, nor, IIRC, any discussion of the mall porch at all; both of which are pretty important to the overall design. I question if the curtain wall glass has enough difference in tones to reflect this rendering. As it appears in construction the glass color is the same tone throughout.
April 30, 201510 yr I don't think the one in Columbus looks bad at all. Love the varied colors and surfaces. It's upscale and classy. At the same time, I'm glad Cleveland is getting a big shiny tower near the lake. Win-win! This! I'm glad we're starting to get more glass and metal curtain wall buildings (Ernst & Young, County HQ, Celebreeze exoskeleton, Hilton). Helps to offset the “beige" motif we have going on. Lol.
April 30, 201510 yr i was reading where the crane has 3 scheduled jumps. The next is scheduled for early May!
April 30, 201510 yr i was reading where the crane has 3 scheduled jumps. The next is scheduled for early May! It was scheduled for this weekend, May 2-3. I haven't heard whether that's still a go or not.
April 30, 201510 yr Now that I read my previous post again, I apologize for the negative tone. All I intended to say was that the glass siding will be a nice change from the more common stone facades we see downtown.
April 30, 201510 yr ^ No need to apologize. I think the Columbus Hilton is pretty "meh" in its design. But at least it interacts well with its surroundings. The Cleveland Hilton is obviously going to be a much more memorable building.
April 30, 201510 yr i was reading where the crane has 3 scheduled jumps. The next is scheduled for early May! It was scheduled for this weekend, May 2-3. I haven't heard whether that's still a go or not. I read it will jump approximately 60 feet. https://www.instagram.com/cle_and_beyond/https://www.instagram.com/jbkaufer/
April 30, 201510 yr http://www.cuyahogacounty.us/pdf_home/en-US/ConventionCenter/ProjectUpdates/March2015.pdf Many additional progress photos at the end of this document. https://www.instagram.com/cle_and_beyond/https://www.instagram.com/jbkaufer/