May 22, 20205 yr Thanks @DTCL11 and @Gnoraa Slightly off topic, but did you guys happen to notice anything at the Market Tower site? I'm a little more worried about that one actually happening now with how crazy the economy has become.
May 22, 20205 yr 1 minute ago, cbussoccer said: Thanks @DTCL11 and @Gnoraa Slightly off topic, but did you guys happen to notice anything at the Market Tower site? I'm a little more worried about that one actually happening now with how crazy the economy has become. Nothing. Parking lot operations are still normal as of last weekend when I went by. I can't speak for any day to day details like more core testing or not.
May 22, 20205 yr 12 minutes ago, cbussoccer said: Has anyone ventured past the construction site recently? Are they still playing in the dirt, or should we expect to see anything vertical happening soon? I haven't seen an application filed for a crane on the oeaaa website, so I'm assuming that's still a ways off. I actually grabbed some pictures the other day and totally forgot to post.
May 22, 20205 yr 4 minutes ago, cbussoccer said: Thanks @DTCL11 and @Gnoraa Slightly off topic, but did you guys happen to notice anything at the Market Tower site? I'm a little more worried about that one actually happening now with how crazy the economy has become. I didn't take the time to seek out/look, and I should have because I did stop in at North Market to pick up my much missed cheese I used to grab at the end of my work week haha I've volunteered to be part of phase 1 for my office building to return, so I will be down there much more in a few weeks to watch for activity.
May 26, 20205 yr Went on a little construction tour yesterday and grabbed some progress images. Hilton II Tower. Enjoy.
May 26, 20205 yr I really hope they put up a construction cam for this project once they actually get some above ground work going. Although, if they do, I will be wasting a lot of time watching that and the Crew Stadium construction cam...
June 9, 20205 yr The permits hit the FAA this morning. I was slightly off in my scaling, to my surprise and excitement the total hight will clock in at 361' tall! Additionally, the crane permits were filed! They will be using a 407' tower crane with a permit start of 7/1/2020. Doesn't mean that it will be up 7/1 but that means it should be going up soon.
June 9, 20205 yr 5 minutes ago, DevolsDance said: The permits hit the FAA this morning. I was slightly off in my scaling, to my surprise and excitement the total hight will clock in at 361' tall! Additionally, the crane permits were filed! They will be using a 407' tower crane with a permit start of 7/1/2020. Doesn't mean that it will be up 7/1 but that means it should be going up soon. Good! This will mean that it will be at least 328 feet from ground level and be the 15th building in Columbus over 100 meters tall. We have not had another one in over 25 years I believe.
June 9, 20205 yr 20 minutes ago, Toddguy said: Good! This will mean that it will be at least 328 feet from ground level and be the 15th building in Columbus over 100 meters tall. We have not had another one in over 25 years I believe. Very exciting! I wish there were 4-5 others being built as well. It would be so cool if the original North Market Tower was being built simultaneously!
June 9, 20205 yr 1 hour ago, Zyrokai said: Very exciting! I wish there were 4-5 others being built as well. It would be so cool if the original North Market Tower was being built simultaneously! Depending on the timing of things (assuming Market Tower does get built), I think we could see Market Tower getting started while this tower is wrapping up. It would definitely be cool to see.
June 9, 20205 yr 36 minutes ago, Gnoraa said: Site vantage point from my office. If you don't provide weekly progress updates you will be banned!
June 9, 20205 yr 23 minutes ago, cbussoccer said: If you don't provide weekly progress updates you will be banned! I volunteered for wave 1 of returning to the office just for the sake of UO haha
June 9, 20205 yr 29 minutes ago, Gnoraa said: I volunteered for wave 1 of returning to the office just for the sake of UO haha You are the real MVP.
July 2, 20204 yr Author "You don't just walk into a bar and mix it up by calling a girl fat" - buildingcincinnati speaking about new forumers
July 2, 20204 yr Hopefully this means they will be building the crane soon. Sometimes the bases gets installed but the crane isn't actually built for another month or two.
July 2, 20204 yr 9 hours ago, cbussoccer said: Hopefully this means they will be building the crane soon. Sometimes the bases gets installed but the crane isn't actually built for another month or two. Yea, the third tower base for the OSU 15th and High project has been there for months
July 3, 20204 yr 21 hours ago, TH3BUDDHA said: Yea, the third tower base for the OSU 15th and High project has been there for months Arguably, that could have been installed pre-decision about stalling building B and it's just going to wait there until they decide to resume that work.
July 3, 20204 yr Just now, jebleprls22 said: Arguably, that could have been installed pre-decision about stalling building B and it's just going to wait there until they decide to resume that work. I mean, it will definitely be there unused for longer now because of corona, but it had been installed at the same time as the others and had already sat unused for a while before corona.
July 7, 20204 yr So I was trying to find a construction cam for this project when I stumbled across a proposal from NBBJ that was not selected. I'm very glad it wasn't chosen, but they had some interesting ideas. http://timcousino.com/2018-hilton-20-proposal-nbbj/
July 7, 20204 yr 1 hour ago, cbussoccer said: So I was trying to find a construction cam for this project when I stumbled across a proposal from NBBJ that was not selected. I'm very glad it wasn't chosen, but they had some interesting ideas. http://timcousino.com/2018-hilton-20-proposal-nbbj/ I wouldn’t be all that mad if this rendering was built in the lot on the north side of the convention center though.
July 7, 20204 yr 1 hour ago, VintageLife said: I wouldn’t be all that mad if this rendering was built in the lot on the north side of the convention center though. Yes that lot along Goodale is just begging for something like this-especially with the garage being right next to it. Maybe a combo hotel with condos/apts on top? Also right on High at the edge of the Short North and with proximity to the rest of downtown. Such a nice location IMO. Edited July 7, 20204 yr by Toddguy
July 7, 20204 yr 3 minutes ago, Toddguy said: Yes that lot along Goodale is just begging for something like this-especially with the garage being right next to it. Maybe a combo hotel with condos/apts on top? Also right on High at the edge of the Short North and with proximity to the rest of downtown. Such a nice location IMO. I didn’t think about condos/apts but yeah that would be great. I’m sure it will get developed eventually, just hope it’s something with some good height
July 7, 20204 yr 1 minute ago, VintageLife said: I didn’t think about condos/apts but yeah that would be great. I’m sure it will get developed eventually, just hope it’s something with some good height I imagine it would have to have some decent height based on the relatively small size of the lot. It's actually pretty similar to the footprint of the Hilton 2.0 tower.
July 7, 20204 yr 10 minutes ago, cbussoccer said: I imagine it would have to have some decent height based on the relatively small size of the lot. It's actually pretty similar to the footprint of the Hilton 2.0 tower. I would hope that when that lot is developed it will be a project that would have a bare minimum of 15 floors. Hopefully more. That lot could be developed with at least a 20,000 square foot building "footprint" if not a bit more than that. I think that space is about 300 feet long and varies from about 75-80 feet wide closest to High to over 125 feet wide near the parking garage. The parking garage already in place is a huge benefit. And they could always squeeze in another small parking garage for the Convention Center somewhere on the eastern side of it. I think it is a great location on High, adjacent to the Arena District and inbetween the bulk of downtown and the Short North. You also have the Cbus circulator going right by it. Also by being set back over 100 feet east of High it would not necessarily block the views down High from the Joseph north of it or the views up High from the Convention Center Hotel to the south of it. Edited July 7, 20204 yr by Toddguy
July 10, 20204 yr I was just at the copy/printer machine in my office, which overlooks the site, and there was at least one large semi-truck with the large blue crane body laying on it's side. My guess is the crane will be going up rather soon based on this observation. Nothing all that surprising, but just a little update for y'all.
July 10, 20204 yr 2 minutes ago, Gnoraa said: I was just at the copy/printer machine in my office, which overlooks the site, and there was at least one large semi-truck with the large blue crane body laying on it's side. My guess is the crane will be going up rather soon based on this observation. Nothing all that surprising, but just a little update for y'all. My guess is it'll go up either tomorrow or Sunday when they can easily close down the ROW for a few hours. Edited July 10, 20204 yr by DevolsDance
July 10, 20204 yr 2 minutes ago, DevolsDance said: My guess is it'll go up either tomorrow or Sunday when they can easily close down the ROW for a few hours. I'll also add there have been concrete trucks lined up in a row all week long down below at the below street High Street grade pouring what seems like nonstop concrete, so I'm guessing they are shoring up much of the foundation area now after all of the below grade work they've been doing for months.
July 10, 20204 yr 1 hour ago, DevolsDance said: My guess is it'll go up either tomorrow or Sunday when they can easily close down the ROW for a few hours. Given the current state of activity along High Street, it would probably be easier to get ROW closure on a weekday than it ever would have been on a quiet Sunday evening before Covid came around. You are probably right though, I'm guessing it will be tomorrow or Sunday.
July 10, 20204 yr Of note, the applications for the tower and crane have been approved. Just in case we needed any further confirmation. https://oeaaa.faa.gov/oeaaa/external/searchAction.jsp?action=displayOECase&oeCaseID=440822939&row=1 https://oeaaa.faa.gov/oeaaa/external/searchAction.jsp?action=displayOECase&oeCaseID=442145384&row=2
July 10, 20204 yr This crane getting delivered to the site and a new tower proposal. This randomly became a great news day for Cbus development. I've been craving it.
July 10, 20204 yr 1 minute ago, TH3BUDDHA said: This crane getting delivered to the site and a new tower proposal. This randomly became a great news day for Cbus development. I've been craving it. It's definitely some much needed positivity. The past few months have sucked for a number of reasons.
July 10, 20204 yr 54 minutes ago, cbussoccer said: It's definitely some much needed positivity. The past few months have sucked for a number of reasons. 56 minutes ago, TH3BUDDHA said: This crane getting delivered to the site and a new tower proposal. This randomly became a great news day for Cbus development. I've been craving it. Completely agree. It had been quite a drought as far as progress on new or proposed developments were concerned, to an extent. Obviously much of it was due to extenuating circumstances which is completely understandable, but still, it gets to you. Really happy to see the Hilton tower proceeding as planned.
July 10, 20204 yr 28 minutes ago, CMHOhio said: It had been quite a drought as far as progress on new or proposed developments were concerned, to an extent. Yea, can we also hurry and get Scioto Peninsula and Gravity 2.0 started now, please?
July 10, 20204 yr 1 minute ago, TH3BUDDHA said: Yea, can we also hurry and get Scioto Peninsula and Gravity 2.0 started now, please? I drove past Gravity 2.0 site this morning on my normal commute in on Broad and there was significant earth movement taking place finally.
July 10, 20204 yr 1 hour ago, Gnoraa said: I drove past Gravity 2.0 site this morning on my normal commute in on Broad and there was significant earth movement taking place finally. Even more good progress news for today! I've driven by there a few times recently waiting for some movement and had always been disappointed. Edited July 10, 20204 yr by TH3BUDDHA
July 10, 20204 yr Agree with all the positive stories breaking today that we really needed it. This board has been somewhat dead recently and I stopped coming here (sorta) just to clear mental space for my Covid concerns, among other things. Glad I chose today to stop on by. Feel like there's a lot to catch up on despite not much news overall from the past few months.
July 11, 20204 yr 35 minutes ago, TH3BUDDHA said: Someone on Reddit posted an image of the crane going up: Erection!
July 11, 20204 yr I was just driving across town on 670. The crane isn't done yet, but it is up above the existing Hilton and is VERY visible from 670.
July 12, 20204 yr How much taller will this crane get? In the renderings it looks like the new building is slightly taller than the original Hilton.
July 12, 20204 yr 3 minutes ago, Kriegs said: How much taller will this crane get? In the renderings it looks like the new building is slightly taller than the original Hilton. This crane will grow to 407 feet. The tower will be 361 feet.
July 12, 20204 yr 7 minutes ago, cbussoccer said: This crane will grow to 407 feet. The tower will be 361 feet. How tall would you say the crane is currently?
July 12, 20204 yr 6 minutes ago, TH3BUDDHA said: How tall would you say the crane is currently? I have no idea. I’ve only seen it in the pictures that have been posted here. I would guess about 200 feet though.
July 12, 20204 yr The crane is now visible on the panorama view of the crew stadium construction cam. The panorama and HD panorama are only updated once daily, but they will provide a nice view of the construction progress once the tower rises above the existing Hilton. https://public.earthcam.net/tJ90CoLmq7TzrY396Yd88LfYWPyQxkt0K3IoDnSqPq4!.tJ90CoLmq7TzrY396Yd88Gb4mDI1mUKaHHz239AX6yw!/downtown_stadium/stadium/panorama_-_ultrahd
July 12, 20204 yr Taken Sat. 7-11-20 evening. View from Jeffery Park From North 4th The recently completed convention center parking garage along North 3rd in the foreground
July 12, 20204 yr 18 hours ago, cbussoccer said: I have no idea. I’ve only seen it in the pictures that have been posted here. I would guess about 200 feet though. I know you're just guessing, but crazy it will end up being doublish this height. Gonna be awesome watching this go up.
Create an account or sign in to comment