I admit, I may be naive in what drives the cost up for skyscraper construction, but out of curiosity, if the depth to bedrock in UC is around 40 feet, but downtown is much deeper (I kinda recall ~200'?), would building a 40-50 story building in UC be more cost feasible than downtown?

  • Replies 1k
  • Views 182.3k
  • Created
  • Last Reply

Top Posters In This Topic

Most Popular Posts

  • NorthShore64
    NorthShore64

    (4-24-22)              

  • Here’s some photos of the tree removal area. Sent from my iPhone using Tapatalk

  • BTW, there's a lot more renderings of Artisan and especially of the interiors on Zillow https://www.zillow.com/b/artisan-cleveland-oh-9FrLLR/  than there is on the Artisan's own website. Note that Lib

Posted Images

  • Author
4 hours ago, scg80 said:

I admit, I may be naive in what drives the cost up for skyscraper construction, but out of curiosity, if the depth to bedrock in UC is around 40 feet, but downtown is much deeper (I kinda recall ~200'?), would building a 40-50 story building in UC be more cost feasible than downtown?

 

I would think so. And considering the huge need for housing in that area, the demand is certainly there. I'm hearing rumblings that there's a market for 10,000+ housing units in that area in the coming decade. Some of that can be satisfied with low- and mid-rise buildings of course. But there's gotta be some high-rises mixed in there too.

"In the souls of the people the grapes of wrath are filling and growing heavy, growing heavy for the vintage." -- John Steinbeck

Speaking of tall buildings, here’s a fun perspective showing how tall the Artisan will be. (From behind Plum Kitchen) 

 

EB281C54-BD0F-4D18-9E85-A4C25604178B.jpeg

  • 2 weeks later...

More perspectives of the Artisan tower Crane from this afternoon.

 

This will totally transform the district’s skyline and density, and I can’t wait to watch it go vertical!

ECA12A26-934E-4E9C-BC79-D4CB7A189940.jpeg

8DBFA26E-FDFB-4D35-8BCB-B1382E3AEA8B.jpeg

EBA0625E-9CF9-4F89-AF50-2A595EB2633B.jpeg

E331CC4C-DB39-4CD4-A0E7-E73059910E27.jpeg

Working on framing for the second floor today.

 

IMG_2288.thumb.JPG.7d20ec4814b8dbd100735a8f88d4ac33.JPG

 

 

 

Isn’t Library Lofts supposed to have its groundbreaking in July. Only two days to go.

  • Author

Checking 

"In the souls of the people the grapes of wrath are filling and growing heavy, growing heavy for the vintage." -- John Steinbeck

  • Author

Article coming -- but I have three articles backed up. So I hope to get to it by Monday (hint hint).

"In the souls of the people the grapes of wrath are filling and growing heavy, growing heavy for the vintage." -- John Steinbeck

  • Author

Artisan+groundbreaking+072921-Ronayne-1.

 

FRIDAY, JULY 30, 2021

Library Lofts high-rise construction starting soon

 

Here comes another major construction project that will produce a tower crane in the sky over Cleveland, and over University Circle in particular. And we're just getting warmed up, Cleveland.

 

Site preparation work is scheduled to start on or about Aug. 2 for Library Lofts -- the next phase of the massive Circle Square development. A tower crane for this project will likely arrive on the site well before Thanksgiving. And with all of the construction happening in Cleveland, there will be a lot for which to be thankful.

 

MORE:

https://neo-trans.blogspot.com/2021/07/library-lofts-high-rise-construction.html

"In the souls of the people the grapes of wrath are filling and growing heavy, growing heavy for the vintage." -- John Steinbeck

Thank you to the always  great @KJPfor an uplifting and exciting update on University Circle construction. 
 

As University Circle flourishes, Cleveland, as a whole benefits, particularly downtown. Like superstar players on the same team, there’s a sense of one “downtown” lending gravitas to the other.  UC has the urban sophistication to match  any city in the country, perhaps even international comparisons apply.  It’s gratifying to see its skyline beginning to reflect its strategic importance. 
 

I’m really looking forward to seeing The Artisan, in particular, rise to become the new star at University Circle- it’s going to be a beautiful tower.  But the news that it will have new, high profile neighbors shortly - and that its reign as tallest may be brief - is both exciting and logical.  After all, who wouldn’t want to live or work in the region ? 

On 7/30/2021 at 11:22 PM, CleveFan said:

Thank you to the always  great @KJPfor an uplifting and exciting update on University Circle construction. 
 

As University Circle flourishes, Cleveland, as a whole benefits, particularly downtown. Like superstar players on the same team, there’s a sense of one “downtown” lending gravitas to the other.  UC has the urban sophistication to match  any city in the country, perhaps even international comparisons apply.  It’s gratifying to see its skyline beginning to reflect its strategic importance. 
 

I’m really looking forward to seeing The Artisan, in particular, rise to become the new star at University Circle- it’s going to be a beautiful tower.  But the news that it will have new, high profile neighbors shortly - and that its reign as tallest may be brief - is both exciting and logical.  After all, who wouldn’t want to live or work in the region ? 

I love all of this minus Ronayne’s quote saying. that "The future of the city is here." - that’s just wrong. The future of the city is THE CITY. Both can (and will) exist and proper. But the city center is the key to the Cleveland. 

  • Author
16 hours ago, OHinMD said:

I love all of this minus Ronayne’s quote saying. that "The future of the city is here." - that’s just wrong. The future of the city is THE CITY. Both can (and will) exist and proper. But the city center is the key to the Cleveland. 

 

He's running for elected office and trying to pump up his achievements in UC.

"In the souls of the people the grapes of wrath are filling and growing heavy, growing heavy for the vintage." -- John Steinbeck

Shame on me for ignoring the other crane that has been just out of frame up the hill 😑

pic from about 30 minutes ago. 

8-2-arty.jpg.4250fbcf3ca27fe3a6e64508df93e1d6.jpg

In case anyone was wondering, there has been no movement at the Library Lofts site as of the evening on 8/3.

 

Nobody even mowed the weeds 🙄

 

weeds.jpg.9a2ebeafd457468757de234f8d4a7232.jpg

  • Author
11 hours ago, WhatUp said:

In case anyone was wondering, there has been no movement at the Library Lofts site as of the evening on 8/3.

 

Nobody even mowed the weeds 🙄

 

weeds.jpg.9a2ebeafd457468757de234f8d4a7232.jpg

 

Your camera is pointed at the wrong place at the wrong time. Please reread this paragraph and redirect your camera.....

 

After the city approved Library Lofts' final design May 21, general contractor Panzica Construction set up a construction timetable for the project. That schedule shows, starting about Aug. 2, Chicago-based Power Construction will build 50 temporary library parking spaces on the east side of Stokes Boulevard and add traffic control measures. Fencing and signage around the building site will follow a week or so later.

 

....I have not been over that way since Monday so I'm interested to know what, if anything is happening on the east side of Stokes.

"In the souls of the people the grapes of wrath are filling and growing heavy, growing heavy for the vintage." -- John Steinbeck

meh, any nearby lots likely wont remain for long. all boats rise when big projects like this take hold.

Sorry to report no apparent activity at the site or east of Stokes......yet.

  • 2 weeks later...
  • Author

Permit application for the first four floors of the building. Temporary parking and foundation work were in separate applications...

 

Record B21023330: 

Com Building Permit

Record Status: Application Pending

 

Work Location

10555 Euclid AVE
CLEVELAND OH 44106

 

Record Details

Project Description: Library Lofts at Circle Square
The proposed work is being submitted as a Part I application for the Site, Steel, Foundation and Cast in Place (CIP) Superstructure for Library Lofts. The proposed new structure will house 207 for-rent residential units with residential amenities on floor 3. Parking will be provided by the parking garage provided as part of the overall proposed Circle Square development within the block directly north of Reserve Court. The remaining building including the completed construction documents for the CPL MLK Branch which makes up the majority of the Ground and Second Floors will be submitted separately. The zoning application for the building was previously approved per record number B21009516. Drawings without a seal are provided for reference. The total area being submitted for review is 53,874 GSF (1st - 20,529; 2nd - 8,530; 3rd - 17,398; Partial 4th - 7,417). Please refer to sheet LS101 for applicable code information.

 

Owner: Library Lofts, LLC

1999 Circle Drive, Suite B

Cleveland OH 44106

 

Design Professional information

Brandon T Garrett
Bialosky Cleveland
6555 Carnegie Ave
Cleveland, OH, 44103
United States

Contact Phone

216-767-2015

E-mail: [email protected]

 

 

 

 Additional Information

Job Value($): $4,555,000.00

Housing Units: 207

Number of Buildings: 1

 Application Information

COMMERCIAL

Nature of Job Description.: New Construction

Use Group 1: R-2 Residential - Permanent Housing - Shared Egress

Construction Class: IB Hi-Rise Reduced from IA

Certificate of Occupancy Required: No

 

BUILDING CODE

Work Area: 53874

No. of Stories/Units: 11

Bldg Footprint (SqFt): 20530

Sprinklers: Yes

Fire Alarm: Yes

Allowable Load Per Sq. Ft. Per Floor: Varies (150lb max), See S001

Occupant Load Per Floor: Varies (519 Library)

KSQFT: 54

KFPSQFT: 21

Sprinkler: NFPA 13

 

SWPP Required: Yes

Parcel Number: 119-20-037

Ward: 9

"In the souls of the people the grapes of wrath are filling and growing heavy, growing heavy for the vintage." -- John Steinbeck

  • Author

On the design-review agenda for today......

 

EUCLID CORRIDOR DESIGN REVIEW
1. EC2021-021 – Circle Square District Streetscape Reconstruction: Seeking Schematic
Approval
Project Address: Chester, Stokes, Reserve Square
Project Representative: Steve Rubin, Midwest Development Partners
 Paul Volpe, Urban Designer
 Doug Blank, Baker Engineering
 Cassandra Rice, Site Design

"In the souls of the people the grapes of wrath are filling and growing heavy, growing heavy for the vintage." -- John Steinbeck

34 minutes ago, KJP said:

Project Address: Chester, Stokes, Reserve Square
 

 

That's Reserve COURT -- Not square!   That error will add six months to the approval!   (kidding)

 

 

Edited by Pugu

APPROVED! APPROVED! 

 

BUILD !!!!!!

 

😆

Work progressing nicely!

820.jpg.aa003ff6c201d0bc4b67b4d2be9bab08.jpg

As of 8/20/21

FD3D216C-403B-4DC3-9181-3DEFDB22BEC5.jpeg

B302BE2A-F2B4-492F-B486-87FFF13D9330.jpeg

ECCDF165-9362-4354-AF35-85E3CB83F23A.jpeg

E77A0525-5107-4EAF-BB2F-BDCE5E288B5A.jpeg

7C0D60C7-A105-462C-B747-F955911B0712.jpeg

Agreene, love your drone shots.  Keep them coming , please.

Boy, those aerial shots - showing the development on either side - really hammer home what a great site this is.  And what a shabby state it's in.  (I won't bother lamenting the CC power thing - oops).

 

 

  • 2 weeks later...

I can't compete with @Agreene, but here is a grainy iphone zoomed in update from today. Is working on a Saturday significant? 

1246835433_artisan9-4.jpg.e447ba1f42c2c6533582c0a908b1028b.jpg

(9-5-21)

2139855763_CLE_9-5-21(119).thumb.jpg.90fa831612ec14d7f8f08d461874df46.jpg

18 hours ago, NorthShore647 said:

(9-5-21)

2139855763_CLE_9-5-21(119).thumb.jpg.90fa831612ec14d7f8f08d461874df46.jpg

This is actually going up at a pretty good rate!

977140250_artisan916.jpg.e8e034ba5494d86f027c523e3aba3ef1.jpg

1034897538_cranereflection916.jpg.c2739d34c5031d6af2c8ce5461a821f9.jpg

It looks like still no action at Library Lofts site.  Let's see what takes longer to break ground...LL or City Club.

  • Author
1 hour ago, Htsguy said:

It looks like still no action at Library Lofts site.  Let's see what takes longer to break ground...LL or City Club.

 

The county property map shows a brand-new replatting of the Library Lofts site, probably to create separate parcels for the ground-floor library and for the upper-floors apartment building.

 

City Club foundation permit's status has been stuck at "issuance pending" for more than a month.

"In the souls of the people the grapes of wrath are filling and growing heavy, growing heavy for the vintage." -- John Steinbeck

Ah jeez. Is it simply beurocratic inertia or something with the developers? It is SO hard to build things anymore.

Please forgive the glare of the morning sun shining down on progress!

9242.jpg.22d2a5f826b35697af208dc139d49777.jpg

924.thumb.jpg.9b8796f8fb897bdc7582086d60564f45.jpg

On a beautiful day:

art929.thumb.jpg.cfdbfbb9683a4ca345d6c4622c3b2ef5.jpg

arti929.jpg.1a68b4181a3cab164b1d434cf49ce27a.jpg

(10-2-21)

2176784_CLE_10-2-21(1).thumb.jpg.a0680b0957896f1e823e0a8cf95fa2eb.jpg

 

177115195_CLE_10-2-21(2).thumb.jpg.fdf2d68f82e38ccfb3a88f89eea4c97a.jpg

 

1328270662_CLE_10-2-21(4).thumb.jpg.e2212f1775bf5f1254750c22255368d2.jpg

 

1836437696_CLE_10-2-21(5).thumb.jpg.d79d07ea8ece30d8916bb4722146edc5.jpg

 

1584996784_CLE_10-2-21(6).thumb.jpg.2ed28ffa29378343718e41dc56e74963.jpg

Thanks for the update pics.  Still crickets on Library Lofts site.

They seem to be making great progress after ground breaking.

 

edit. And political red tape cleared.

Edited by Mildtraumatic

  • 2 weeks later...

From 10/12:

1444488035_1012.jpg.937abdcecb66b23835a0ea7c3326c5b9.jpg

From 10/15:

ARTI.jpg.8d7666005c865878e67f609b26d65145.jpg

  • 2 weeks later...

 Had the opportunity to visit The Artisan site today - wow, it’s going to be even more impactful than I imagined - great site with tremendous street presence.  Coming down Chester towards University Circle the crane  shows how commanding this building will be.
Not a lot different since @WhatUpposted but I took a few more pics cuz that’s what we do at UO.   Enjoy 

E7489568-1D1E-47CF-ADC7-D3C5C18792DB.jpeg

B0432875-C319-4898-93CD-E38570EAB49F.jpeg

827C1F13-D95D-4DDB-AFCE-884FCF3B578A.jpeg

2BAADCCD-7A44-4335-9E1E-CC6F2344CD7B.jpeg

F187E957-0DCA-4CA8-9940-116130DD7F3D.jpeg

71789F4E-E7B4-41AB-8A1D-72501DA2ED98.jpeg

Edited by CleveFan

  • 2 weeks later...
  • Author

Circle-Square-Sept2020-12.jpg

Nine of 42 TMUD applications are from Greater Cleveland

By Ken Prendergast / November 3, 2021

 

5 are in Cleveland, 1 each in Shaker Hts, Lakewood, Elyria & Mentor

 

Responding to a public records request from NEOtrans, the Ohio Department of Development supplied to NEOtrans a complete list of all applications to the new Transformational Mixed Use Development (TMUD) tax credit program. Project applications had to be submitted to the state at the end of the business day Oct. 29. There are a lot of numbers to break down in the applications.

 

There were 42 applicants for $100 million in tax credits statewide per year. Of that, $80 million is available for real estate development projects in Ohio’s six major cities with 100,000+ people and $20 million for general applications in smaller cities. Of that, 33 major-city projects are seeking $384,892,370.08 while 11 general projects are wanting $32,803,543.30. State officials said they would favor projects that are almost ready to go and need the TMUD credit merely to get over the finish line.

 

MORE

https://neo-trans.blog/2021/11/03/nine-of-44-tmud-applications-are-from-greater-cleveland/

 

"In the souls of the people the grapes of wrath are filling and growing heavy, growing heavy for the vintage." -- John Steinbeck

I’m confused by the uc square application. Is Midwest suggesting they don’t have funding in hand to complete the building they have already started building? If not, then what exactly is the money for?

I’m confused by the uc square application. Is Midwest suggesting they don’t have funding in hand to complete the building they have already started building? If not, then what exactly is the money for?
I was confused as well by that but I assume that they are requesting money for the remaining portions of the project.

Sent from my Pixel 4 XL using Tapatalk

32 minutes ago, MyPhoneDead said:

I was confused as well by that but I assume that they are requesting money for the remaining portions of the project.

Sent from my Pixel 4 XL using Tapatalk
 

That’s what I assumed before reading @KJP’s article. 

The biggest surprise/disappointment for me from @KJParticle was the quoted from Steve Rubin that "Midwest continues to work on closing financing for 11-story Library Lofts apartments".  For what ever reason I never thought financing was still an issue and it was suppose to break ground last July.  I have been speculating that the delay in starting has been some minor construction issues.  I guess this is not the case.  It is additionally frustrating because any delay on Library Lofts delays phase 2 since they cannot demolish the current MLK library branch until the new one is finished.

  • Author
Just now, Htsguy said:

The biggest surprise/disappointment for me from @KJParticle was the quoted from Steve Rubin that "Midwest continues to work on closing financing for 11-story Library Lofts apartments".  For what ever reason I never thought financing was still an issue and it was suppose to break ground last July.  I have been speculating that the delay in starting has been some minor construction issues.  I guess this is not the case.  It is additionally frustrating because any delay on Library Lofts delays phase 2 since they cannot demolish the current MLK library branch until the new one is finished.

 

I was surprised about that too. I thought financing wasn't an issue.

 

A clarification -- the current MLK Branch Library site is considered by Rubin to be part of phase 1. But you are correct about the sequencing.... They cannot build the hotel-over-retail until the old MLK Branch is razed. They cannot raze the old MLK Branch until the new MLK Branch is built. And, to add to the sequencing dominoes, they cannot build phase 2 on the east side of Stokes until the new MLK Branch opens because the temporary parking for the old MLK Branch will be put on the east side of Stokes.

 

calculating-woman.gif

"In the souls of the people the grapes of wrath are filling and growing heavy, growing heavy for the vintage." -- John Steinbeck

I guess I am less concerned how the delayed demolition of the current MLK will affect Phase 2 on the east side of Stokes as I really don't see that happening for another 3-4 years in any event.  It is the most questionable part of the project because of the office component and will be the most difficult to put together.  However, in my mind further delay on the west side of Stokes, in a minor way hurts the Artisan.  I don't think it will be that big a deal but it may just look slightly isolated for a while which is not a good look when trying to lease apartments.  Continuing construction right outside tenants windows also may not be a great selling point.  Probably making a mountain out of a mole hill but I just want this to move forward.  I am ready to go down there with my own sledge hammer and shovel.

From 11/4:

artii.jpg.efe3dbe5ef184fc8be4008170f2f1716.jpg

arti1.jpg.c97e73be1e3121658e267ef68488bb36.jpg

arti3.jpg.c3ef63a71d3ac633a41ac8aaf0106653.jpg