13 hours ago, columbus17 said:

Jug Street has to be the worst name ever.

It is bad. But it could be worse-it could be plural. 

  • Replies 1.3k
  • Views 119.3k
  • Created
  • Last Reply

Top Posters In This Topic

Most Popular Posts

  • Westervillian
    Westervillian

    Good Afternoon UrbanOhio.  Long time visitor, first time poster.  Love the diverse conversation.  I work in the design field in New Albany and since this project has been announced, I figured Columbus

  • Annotated a bit:  

Posted Images

14 hours ago, columbus17 said:

Jug Street has to be the worst name ever.

 

14 hours ago, amped91 said:

*3Bs & K has entered the chat*

 

I think Pickaway County has both of those beat.

 

https://goo.gl/maps/kudFMfxwbJ1KNQbEA

UK0D.jpeg

On 4/8/2023 at 8:51 PM, ColDayMan said:

NAME CHANGES PLEASE!!!

I mean, I'll give Clover Valley a 7.5/10 it sounds kinda scenic, almost like a setting in a fantasy novel. Don't have a problem with Mink either!

Green Chapel...yeah we can do better.

I'm not crazy about some of the street names, but I guess they don't bother me that much. Piggybacking on some of the photos Luvcbus posted, I really can't wait for the real construction to get started with pouring concrete and the plumbing, electrical and steel work to start.

Edited by John7165

 

Three's company!

 

IMG_20230410_104045_3.thumb.jpg.ab12427f329f0d6d5e0ea96c861652a7.jpg

 

IMG_20230410_103854_7.thumb.jpg.c4d511d1066a41e425ad92739108c12f.jpg

 

IMG_20230410_103751_7.thumb.jpg.28252738b25a252433c499e09f155d2d.jpg

 

 

1 hour ago, John7165 said:

plumbing, electrical

 

Around 500 workers started the plumbing and electrical work in early February.

 

Mink is starting to grow on me

Then there was the massive mink massacre in early 2020 when people thought minks were spreading COVID.

7 hours ago, GCrites80s said:

Then there was the massive mink massacre in early 2020 when people thought minks were spreading COVID.

"Mink Massacre" also sounds like a good band name. 

 

The only name that bothers me is Jug Street. I cannot- not think of the movie "Mother, Jugs, and Speed" lol. And then I can't get the movie out of my head!

Edited by Toddguy

LPBC.gif

"You don't just walk into a bar and mix it up by calling a girl fat" - buildingcincinnati speaking about new forumers

49 minutes ago, Toddguy said:

"Mink Massacre" also sounds like a good band name. 

 

The only name that bothers me is Jug Street. I cannot- not think of the movie "Mother, Jugs, and Speed" lol. And then I can't get the movie out of my head!

 

I get the feeling that one was on TV late at night listed as just "Movie" in the paper around 1985.

 

Things continuing to ramp up at Intel:

 

IMG_20230417_104406_6.thumb.jpg.bdac43f0982c9bdbe2edeb2a02b48d09.jpg

 

IMG_20230417_105120_5.thumb.jpg.d381523db9ca217e83b2b2df693c4ea5.jpg

 

IMG_20230417_104642_8.thumb.jpg.79f90f6ee57c7fbe34f2cc2e22290f82.jpg

 

Some minor updates on upcoming infrastructure work around Intel-

 

Green Chapel roadway improvements project:

 

"Starting the week of April 24, the portion of Clover Valley Road south of Green Chapel Road will be closed to through traffic for one week to facilitate the installation of storm infrastructure for the Green Chapel roadway improvements project. The following week on May 1, the northern portion of the intersection to Kiber Run will be closed for approximately 15 days." 

 

Mink Street roadway improvements project:

 

"Starting on or around May 1, the portion of Mink Street between Innovation Campus Way and Jug Street will be closed to through traffic for one week to facilitate the installation of storm infrastructure for the Mink Street roadway improvements project."

 

https://newalbanyohio.org/answers/new-albany-silicon-heartland/#

 

 

Work on the road construction projects is underway now on Clover Valley, Green Chapel and Mink!

 

IMG_20230424_104033_1.thumb.jpg.af25c0ae608248eab78c732ce2430e3c.jpg

 

And more houses are coming down ahead of the widening as well 

 

IMG_20230424_103750_2.thumb.jpg.3a498738c0d2507d6259c1369c00e387.jpg

 

Construction as far as the eye can see- for miles! 

  • Author
7 minutes ago, CbusOrBust said:

Construction as far as the eye can see- for miles! 

 

I drove around the area on Friday, and it really is construction for miles. Not only is there the massive Intel site, but there's road widening work, utility work, and other separate projects all happening. It's crazy to see, and it's just the beginning.

1 minute ago, cbussoccer said:

 

I drove around the area on Friday, and it really is construction for miles. Not only is there the massive Intel site, but there's road widening work, utility work, and other separate projects all happening. It's crazy to see, and it's just the beginning.

 

We go out every Monday morning and you can definitely feel the momentum building.

 

Today, even Green Chapel, which is on the far edge of the site, was much much busier than even a week ago.

37 minutes ago, CbusOrBust said:

 

We go out every Monday morning and you can definitely feel the momentum building.

 

Today, even Green Chapel, which is on the far edge of the site, was much much busier than even a week ago.

I like the name "Green Chapel". I need to get myself up there and see it myself. Maybe later this week.

18 hours ago, cbussoccer said:

 

I drove around the area on Friday, and it really is construction for miles. Not only is there the massive Intel site, but there's road widening work, utility work, and other separate projects all happening. It's crazy to see, and it's just the beginning.

 

I have an acquaintance that gives me little nuggets of info "off the record".  He told me yesterday when we were there that they plan to make the first slab pour within a week or so!

 

 

Here we go!!!!

 

 

"While there has been plenty of activity at and around the Intel site the past few months, the project is entering a new phase of development with Intel beginning construction work on the fabs. We have been notified that construction crews will be pouring the concrete foundation for the fabs on several days in May. The first pour is scheduled for Tuesday May 9, and we are expecting approximately 225 concrete trucks along Beech Road and Jug Street throughout the day. Additional pours are tentatively scheduled for May 12, 16 and 30, but these dates are subject to change. We will post any schedule changes."

 

https://newalbanyohio.org/answers/new-albany-silicon-heartland/#

 

Since some of the roadway projects around Intel have now kicked off- i thought you guys might be interested in what's planned for the area streets...

 

Planned street design for:

•Clover Valley Rd 

•Jug St

•Miller Rd 

•Beech Rd (from Jug to Green Chapel)

•Green Chapel Rd (from US 62 to Clover Valley)

 

image.png.73cc9b399a4e9a7dfebbbcadad48dd19.png

 

Planned street design for:

•Green Chapel Rd (from Clover Valley to Mink)

•Mink St

•Beech Rd (from Innovation Campus Way to Jug)

 

image.png.25b7dd4e9c7310e0eb901ec8d9abdba5.png

 

 

More info found here:

 

https://newalbanyohio.org/answers/new-albany-silicon-heartland/#

 

7 minutes ago, Luvcbus said:

Since some of the roadway projects around Intel have now kicked off- i thought you guys might be interested in what's planned for the area streets...

 

Planned street design for:

•Clover Valley Rd 

•Jug St

•Miller Rd 

•Beech Rd (from Jug to Green Chapel)

•Green Chapel Rd (from US 62 to Clover Valley)

 

image.png.73cc9b399a4e9a7dfebbbcadad48dd19.png

 

Planned street design for:

•Green Chapel Rd (from Clover Valley to Mink)

•Mink St

•Beech Rd (from Innovation Campus Way to Jug)

 

image.png.25b7dd4e9c7310e0eb901ec8d9abdba5.png

 

 

More info found here:

 

https://newalbanyohio.org/answers/new-albany-silicon-heartland/#

 

"Leisure Trail"...???? Do they mean sidewalk?

2 minutes ago, Toddguy said:

"Leisure Trail"...???? Do they mean sidewalk?

Seems like it would be a smarter option to make them at least shared use paths. 

1 minute ago, VintageLife said:

Seems like it would be a smarter option to make them at least shared use paths. 

Which sounds like a smarter way of saying the cloying "Leisure Trail" lol.  They do look wide(6-7 feet?)whatever they are I will give them that.  I just could not help myself when reading that term.  I want to complain but I was all up and down Hilliard-Rome Rd. today so I will just let it go and be pleased with it.

4 minutes ago, Toddguy said:

They do look wide(6-7 feet?)

 

I read some will be five feet wide, and some will be eight feet wide.

10 hours ago, Toddguy said:

Which sounds like a smarter way of saying the cloying "Leisure Trail" lol.  They do look wide(6-7 feet?)whatever they are I will give them that.  I just could not help myself when reading that term.  I want to complain but I was all up and down Hilliard-Rome Rd. today so I will just let it go and be pleased with it.

If they catch you walking dow those sidewalks for anything but leisure...... you're in some big trouble!

11 hours ago, Luvcbus said:

Since some of the roadway projects around Intel have now kicked off- i thought you guys might be interested in what's planned for the area streets...

 

Planned street design for:

•Clover Valley Rd 

•Jug St

•Miller Rd 

•Beech Rd (from Jug to Green Chapel)

•Green Chapel Rd (from US 62 to Clover Valley)

 

image.png.73cc9b399a4e9a7dfebbbcadad48dd19.png

 

Planned street design for:

•Green Chapel Rd (from Clover Valley to Mink)

•Mink St

•Beech Rd (from Innovation Campus Way to Jug)

 

image.png.25b7dd4e9c7310e0eb901ec8d9abdba5.png

 

 

More info found here:

 

https://newalbanyohio.org/answers/new-albany-silicon-heartland/#

 

I don't like the first design. Those central turn lanes are a mess.

1 minute ago, columbus17 said:

I don't like the first design. Those central turn lanes are a mess.

 

How dare you question the wisdom of the traffic engineer. 🤪

 

23 minutes ago, columbus17 said:

I don't like the first design. Those central turn lanes are a mess.

Well how are they a mess? I don't know much about traffic engineering so I am curious. How would it be better done?

 

There are going to be turn lanes mixed into the median in the second one too.

Edited by Toddguy

19 minutes ago, Pablo said:

 

How dare you question the wisdom of the traffic engineer. 🤪

 

They are Gods, we pedestrians are trash, filth, dirt, or scum./s

1 hour ago, columbus17 said:

I don't like the first design. Those central turn lanes are a mess.

I particularly like the turn lane that is all grass and trees in the second image.

2 hours ago, columbus17 said:

I don't like the first design. Those central turn lanes are a mess.

The central turn lanes are for the dozens of residential properties still on those roads.

 

AEP eyes new transmission line project near Intel

 

"AEP announced in early April its plans to study the construction of a transmission line connecting the existing Vassell Substation near Sunbury to two new substations in New Albany — both along Green Chapel Road, which outlines Intel’s plot of land. 

 

As “energy-intensive” businesses flock to the area east of Columbus, the proposed new infrastructure is vital.

 

AEP has identified New Albany and Johnstown; Hartford, Monroe, and Jersey Townships in Licking County; and Berkshire, Trenton, and Harlem Townships in Delaware County as part of its transmission enhancements and will continue to conduct field surveys and studies through the end of the year, submitting its project application to the Ohio Power Siting Board by early 2024.

 

Once the OPSB greenlights the project, construction can begin — and AEP has estimated it will run through early 2026." 

 

https://www.nbc4i.com/intel-in-ohio/no-offsetting-benefit-to-us-aep-eyes-new-transmission-line-project-near-intel-to-the-chagrin-of-some-residents/

 

Intel footprint as of February 623373B0-BAD6-4E4B-A419-48E16BE8B120.jpeg.013a4b20d375933944cfa2389d2288f0.jpeg

On 4/28/2023 at 8:56 PM, Luvcbus said:

 

"While there has been plenty of activity at and around the Intel site the past few months, the project is entering a new phase of development with Intel beginning construction work on the fabs. We have been notified that construction crews will be pouring the concrete foundation for the fabs on several days in May. The first pour is scheduled for Tuesday May 9, and we are expecting approximately 225 concrete trucks along Beech Road and Jug Street throughout the day. Additional pours are tentatively scheduled for May 12, 16 and 30, but these dates are subject to change. We will post any schedule changes."

 

https://newalbanyohio.org/answers/new-albany-silicon-heartland/#

 

 

If anyone's planning on being in the Intel area this Tuesday and are wondering how the "approximately 225 concrete trucks expected along Beech Road and Jug Street throughout the day" will affect traffic...

 

Some minor updates were released today on the initial foundation pour at Intel scheduled for Tuesday, May 9th and what the plan to keep traffic flowing around the site is:

 

"The concrete will be made in the batch plant on the construction site. The process will involve trucks coming off SR 161 delivering material for the project. These are the same type of trucks that the community has seen over the last several months. Trucks will make multiple trips spread out over an extended period of time to avoid creating a long line of trucks. At this point, we do not expect the community to experience a significant difference from the volume of truck traffic already occurring in the area."

 

https://newalbanyohio.org/answers/new-albany-silicon-heartland/#

 

Random but I caught these leaving Savannah of the Hyundai battery plant.

77F9FB44-5B38-4FF6-8620-15EE20554ED8.jpeg

CD31BAC2-8ED6-460E-8C9F-52954B27AA79.jpeg

I was out in the Newark area over the weekend and driving back to Columbus via 16/161 I noticed what appeared to be some pretty new power line towers on either side of the highway. Much taller and thicker than what's already in the area and they did not have actual lines run yet. They were very clearly new, was still marked as construction sites around the bases. I want to say this was near the Mink Street exit? Whichever one has the new gas station off it that 5 years ago was an exit full of empty fields/

With concrete starting to pour in earnest this month and with at least one of the slabs reportedly being a mind boggling 60 ft thick to eliminate vibrations in the manufacturing process. There's been radio silence from Intel so far but the steelworkers had to have been out there for multiple weeks to tie together the enormous amount of rebar needed for that much concrete. So things are really starting to heat up. Once the footers, foundations, and flooring get poured, then there's no stopping the workers from doing their jobs.

Edited by John7165

 

Just got back from there a few minutes ago.  It's pretty crazy how much busier it is each week compared to the previous week!

 

Snatched a few random ones from Green Chapel Rd, which is the far northern edge of the site

 

IMG_20230508_095838_2.thumb.jpg.ad56b652e6f6c0c34f12c91feb4e1368.jpg

 

IMG_20230508_100101_5.thumb.jpg.ac1f3894313c2c10aa087d9d38c667ce.jpg

 

IMG_20230508_095934_8.thumb.jpg.96749c6db56585816d91c15150fd6238.jpg

 

IMG_20230508_095926_1.thumb.jpg.aa4018ed2ecac570496ec8796886deb0.jpg

 

IMG_20230508_100605_4.thumb.jpg.ea62bd34e14c2ecf56dccd8a2ba88219.jpg

 

IMG_20230508_100055_6.thumb.jpg.ac2ed4d727d57a736c95081d00e8c8dc.jpg

 

 

We went out to Intel again today for the first pour of the foundation.  Unfortunately, (I'm assuming because of the amount of rain over the last couple days) it has been rescheduled for one week from today, on Tuesday May 16th. ☹️ 

 

3 hours ago, CbusOrBust said:

 

We went out to Intel again today for the first pour of the foundation.  Unfortunately, (I'm assuming because of the amount of rain over the last couple days) it has been rescheduled for one week from today, on Tuesday May 16th. ☹️ 

 

They better not wait too long to pour it because the Memorial Tournament is right around the corner and we all know it will bring a monsoon with it.

Edited by John7165

I’m a bit confused by this and I haven’t been directly on site yet. But I do know what there was a concrete pump truck working out there about a month ago. It must have been for some underground utilities or something and I don’t have line of sight to that part.

33 minutes ago, wpcc88 said:

I’m a bit confused by this and I haven’t been directly on site yet. But I do know what there was a concrete pump truck working out there about a month ago. It must have been for some underground utilities or something and I don’t have line of sight to that part.

Me neither cause it is about a 45 mile or more drive lol. I ain't got time or gas for that. Thank God for the photo updates.

4 hours ago, Toddguy said:

Me neither cause it is about a 45 mile or more drive lol. I ain't got time or gas for that. Thank God for the photo updates.


My place of employment has a stake in what’s happening so I don’t have a choice in the matter  🤣🤣

 

We were out at Intel this morning for the first large slab pour of the foundation.

 

I did get a few pics, but until vertical construction starts it's kind of hard to see-

 

Concrete trucks lined up at the batch plant next to the Intel site:

 

IMG_20230516_105400_7.thumb.jpg.b7a764516a967ecfa7ea91657fb6e8bf.jpg

 

IMG_20230516_103909_2.thumb.jpg.936629e141767440708eae199bcc96f6.jpg

 

Crews were also building a second batch plant near the site today:

 

IMG_20230516_104207_8.thumb.jpg.f0a34e3fd11a8be15457954266a73c40.jpg

 

IMG_20230516_103618_1.thumb.jpg.df749ea34a8789e8c56af9d433715152.jpg

 

And the security post that was on Miller near Mink has been moved further back on the site allowing for a better look at the progress.

Snatched a quick one from Miller Rd near where the security post used to be:

 

IMG_20230516_110832_0.thumb.jpg.a8c52ef083a8583f572ae6e6a9f00df0.jpg

 

24 minutes ago, CbusOrBust said:

 

We were out at Intel this morning for the first large slab pour of the foundation.

 

I did get a few pics, but until vertical construction starts it's kind of hard to see-

 

Concrete trucks lined up at the batch plant next to the Intel site:

 

IMG_20230516_105400_7.thumb.jpg.b7a764516a967ecfa7ea91657fb6e8bf.jpg

 

IMG_20230516_103909_2.thumb.jpg.936629e141767440708eae199bcc96f6.jpg

 

Crews were also building a second batch plant near the site today:

 

IMG_20230516_104207_8.thumb.jpg.f0a34e3fd11a8be15457954266a73c40.jpg

 

IMG_20230516_103618_1.thumb.jpg.df749ea34a8789e8c56af9d433715152.jpg

 

And the security post that was on Miller near Mink has been moved further back on the site allowing for a better look at the progress.

Snatched a quick one from Miller Rd near where the security post used to be:

 

IMG_20230516_110832_0.thumb.jpg.a8c52ef083a8583f572ae6e6a9f00df0.jpg

 

Did you see any sign of the rebar tied up by the steel workers?

5 minutes ago, John7165 said:

Did you see any sign of the rebar tied up by the steel workers?

 

No.  Unfortunately you can't get that close without security up your a$$

 

 

Concrete work points to progress at Intel's $20 billion project in New Albany

 

"Intel says construction teams on its $20 billion project in New Albany have poured more than 1,500 cubic yards of concrete this week as part of its shift to a new phase of work at the site that it has dubbed Ohio One.

 

“This is a massive milestone that all of us here in Ohio and at Intel are extremely proud of. The pouring of concrete at Ohio One is more than just construction progress – we are cementing our future in Ohio and our commitment to expanding U.S. leading-edge semiconductor manufacturing capacity."

 

https://www.dispatch.com/story/business/2023/05/18/intels-two-plants-in-new-albany-will-employ-3000-workers/70232792007/

 

image.png.1d24643579c6f91f297b66f57d890543.png

 

image.png.a55eda5292e71e0a6db940c444f3f859.png

 

image.png.973fb4eb4547f3282505136b82eae7b0.png

 

1 hour ago, Luvcbus said:

 

Concrete work points to progress at Intel's $20 billion project in New Albany

 

"Intel says construction teams on its $20 billion project in New Albany have poured more than 1,500 cubic yards of concrete this week as part of its shift to a new phase of work at the site that it has dubbed Ohio One.

 

“This is a massive milestone that all of us here in Ohio and at Intel are extremely proud of. The pouring of concrete at Ohio One is more than just construction progress – we are cementing our future in Ohio and our commitment to expanding U.S. leading-edge semiconductor manufacturing capacity."

 

https://www.dispatch.com/story/business/2023/05/18/intels-two-plants-in-new-albany-will-employ-3000-workers/70232792007/

 

image.png.1d24643579c6f91f297b66f57d890543.png

 

image.png.a55eda5292e71e0a6db940c444f3f859.png

 

image.png.973fb4eb4547f3282505136b82eae7b0.png

 

Great pictures. You would think with all of the excitement surrounding this project Intel would milk that for all of its PR worth with more frequent updates with photos and video. (Just a suggestion)

 

PS. 1500 cubic yards sounds like a lot, but does anyone know how many total CY's the site will consume when it's done?

Edited by John7165