June 2, 20214 yr I do not think that the transaction gets held up just because it isn't reflected on the county site. I could be mistaken though.
June 2, 20214 yr Quote I do not think that the transaction gets held up just because it isn't reflected on the county site. I could be mistaken though. You are correct. The conveyance is legally complete when the deed is handed over. It's really the title company writing the title insurance policy for the buyer and lender who is exposed by an extended recording gap, and even then, the risk isn't all that high. It's annoying to busy bodies like us but not a big deal in the real world. Edited June 2, 20214 yr by StapHanger
June 2, 20214 yr Title legally transfers when the grantor delivers the deed and the grantee accepts it. A deed doesn't need recorded to be valid. The purpose of recording (via recording statute) is to provide notice to third parties and allow the them to ascertain the status/condition of a title to real property. Thus, grantees need to record in order to protect/preserve their interests.
June 2, 20214 yr Author 34 minutes ago, dski44 said: Title legally transfers when the grantor delivers the deed and the grantee accepts it. A deed doesn't need recorded to be valid. The purpose of recording (via recording statute) is to provide notice to third parties and allow the them to ascertain the status/condition of a title to real property. Thus, grantees need to record in order to protect/preserve their interests. Which is why the more relevant piece of information is that no site/foundation permit application has been submitted to the city. "In the souls of the people the grapes of wrath are filling and growing heavy, growing heavy for the vintage." -- John Steinbeck
June 19, 20213 yr Author I checked earlier this week with a source close to the project who said there is still no final groundbreaking date. "In the souls of the people the grapes of wrath are filling and growing heavy, growing heavy for the vintage." -- John Steinbeck
June 19, 20213 yr No rush. As long as everything transfers Monday and they break ground Tuesday l'm good. You crazy people need to be more patient like me.
June 19, 20213 yr Yeah, we've been waiting 40 years. What's a few more months. Edited June 19, 20213 yr by skiwest
June 19, 20213 yr I’m wondering if City Club is waiting on the price of materials to come back to Earth a bit before breaking ground.
June 19, 20213 yr I'm not in the construction business, so I don't know how it works. I assume contracts for materials would have already been finalized by now. Edited June 19, 20213 yr by skiwest
June 20, 20213 yr 4 hours ago, skiwest said: I'm not in the construction business, so I don't know how it works. I assume contracts for materials would have already been finalized by now. Maybe, maybe not. It all depends on what phase of the project they were in. Since they were close to announcing a groundbreaking date though I would have assumed they had already bought out the steel package.
June 28, 20213 yr Author MONDAY, JUNE 26, 2021 City Club Apartments tower sees delays A 23-story apartment tower proposed to rise on Euclid Avenue in downtown Cleveland has seen potential groundbreaking dates come and go, delayed by several factors. While most of the factors are largely beyond the control of Farmington Hills, MI-based City Club Apartments (CCA), some of the delays are reportedly the developer's fault. It's been more than 10 months since City Planning Commission gave approval to final designs for CCA's planned 240-foot-tall tower called CBD Cleveland. The 300-unit apartment tower with ground-floor retailers/restaurants would rise at 720 Euclid Ave. MORE: https://neo-trans.blogspot.com/2021/06/city-club-apartments-tower-sees-delays.html "In the souls of the people the grapes of wrath are filling and growing heavy, growing heavy for the vintage." -- John Steinbeck
June 28, 20213 yr I hate to be Debbie Downer here but this is basically how it happens here in Cleveland. I really want this project to start construction, so i don't want any feedback that i have a negative point of view etc. I am 67 I have followed Downtown Development since my days living at Fenn Tower in the mid-70's. We here on Urban Ohio get SO EXCITED every time we get some info on a new development and that is because We want it to happen ASAP. Sadly, I believe that somewhere around 10-20% of announced projects actually get built. So we are in for some disappointments to come. You cannot imagine how many Lakefront Development Plans i have seen. ( I really liked the Jane Campbell plan going back to around 1980 AND Basically not much happened ( small pct ) since they were announced. I don't why i have this feeling but i feel that SWH will disappoint us. For what they will eventually build they did not need to buy both the Jacobs & Weston parcels. This CCA project i really want to get built and i hope that they could get things figured out because some of us around here have fear of the other shoe dropping. KJP keep us posted with your EXCELLENT inside info and hopefully this one gets across the finish line.
June 28, 20213 yr If I understand KJP's article correctly and Holzman is being very difficult in negotiations, that suggests to me that he is deliberately delaying the project start. Perhaps he feels City Club has enough irons in the fire for the moment with its three other active projects. Remember: It's the Year of the Snake
June 28, 20213 yr Author My understanding is, much this is on the CEO. He has his way of doing things from city to city to city and the local subcontractors must all change to abide by his budgetary strategy. Look at the estimated cost of this building. It's extremely cheap. The only way you can build a 23-story tower on such a low budget is to cut corners and/or use extremely cheap labor which is difficult to find right now. My understanding is he does this in every city that he builds in. I will give him credit for being able to get it done but his methods have made a lot of people angry here locally. I don't know if he's ticked off people like this in other cities as well. If there wasn't a similarly sized residential building already under construction here in Cleveland, then I would give more credence to the possibility that it's the construction market that is slowing this project. But the Artisan in University circle is well under way and there is no sign of it slowing. "In the souls of the people the grapes of wrath are filling and growing heavy, growing heavy for the vintage." -- John Steinbeck
June 28, 20213 yr 41 minutes ago, KJP said: My understanding is, much this is on the CEO. He has his way of doing things from city to city to city and the local subcontractors must all change to abide by his budgetary strategy. Look at the estimated cost of this building. It's extremely cheap. The only way you can build a 23-story tower on such a low budget is to cut corners and/or use extremely cheap labor which is difficult to find right now. My understanding is he does this in every city that he builds in. I will give him credit for being able to get it done but his methods have made a lot of people angry here locally. I don't know if he's ticked off people like this in other cities as well. If there wasn't a similarly sized residential building already under construction here in Cleveland, then I would give more credence to the possibility that it's the construction market that is slowing this project. But the Artisan in University circle is well under way and there is no sign of it slowing. Isn't it possible that the high volume of construction would be partly what is slowing this down? I count at least four 8+ story rehabs or new construction underway. Those four projects have to be eating up tons of man hours. Sure each of these projects was able to get started, but maybe CCA is sorta the late bird that missed the best worms. 1. Artisan 2. 75 Public Square 3. Ascent at Top of the Hill 4. Intro
June 28, 20213 yr Author 49 minutes ago, LlamaLawyer said: Isn't it possible that the high volume of construction would be partly what is slowing this down? I count at least four 8+ story rehabs or new construction underway. Those four projects have to be eating up tons of man hours. Sure each of these projects was able to get started, but maybe CCA is sorta the late bird that missed the best worms. 1. Artisan 2. 75 Public Square 3. Ascent at Top of the Hill 4. Intro Undeniable that some subs are swamped. Others who can do the job are being knocked out of the box because they are union and too expensive. And the interior design itself is being changed to reduce costs because other aspects of the project are coming in too expensive. I'm sure the record-high steel prices are part of that but sources didn't bring them up, specifically. But everything I'm hearing is that this project is a go. Only question is when. BTW, if contractors are having a capacity problem now, wait until this winter and beyond. They better start recruiting new hires from both inside and outside the metro area to be able to take on City Club, Library Lofts, SHW HQ + R&D, 925 Euclid, Flats East Bank, three big Cleveland Clinic projects, next phases of Metro Health, Bridgeworks, Magellan, possibly nuCLEus, and other projects I'm not at liberty to discuss and I'm sure there's others percolating out there. "In the souls of the people the grapes of wrath are filling and growing heavy, growing heavy for the vintage." -- John Steinbeck
June 28, 20213 yr Total shot in the dark here, but could this project be stalling for a TMUD at this point?
June 29, 20213 yr 1 hour ago, WhatUp said: Total shot in the dark here, but could this project be stalling for a TMUD at this point? I couldn't really see why they would, it's not that big of a development to be considered transformational. The only thing it will be doing is filling a parking crater unless it goes for mass mixed use development like what Stark is trying to secure for NuCLEus
June 29, 20213 yr Author I don't see it either. A friend reminded me today that CCA has used two general contractors in Cleveland to help determine if a project was doable and then dumped them. They did the same thing with one of the largest and most reputable GCs in Chicago for a project there. They only thing they have built in Cleveland so far is a bad reputation. "In the souls of the people the grapes of wrath are filling and growing heavy, growing heavy for the vintage." -- John Steinbeck
July 12, 20213 yr Author Not sure what this means yet, but a building permit application was started June 17 but not completed for 776 Euclid Ave. That's the approximate location of the new City Club Apartments. "In the souls of the people the grapes of wrath are filling and growing heavy, growing heavy for the vintage." -- John Steinbeck
July 14, 20213 yr Total shot in the dark here, but could this project be stalling for a TMUD at this point? Steel prices have been a friend to no one in the construction sector this year. Delays are extending across industries.Sent from my iPhone using Tapatalk
July 15, 20213 yr Author BOOM! THURSDAY, JULY 15, 2021 First building permit issued for City Club Apartments tower On Wednesday, Cleveland's Building Department issued the first of what will likely be many building permits for the construction of a 23-story apartment tower at 776 Euclid Ave. downtown. It is the first documented evidence that the nearly $100 million City Club Apartments tower is about to see tangible construction activity after numerous delays. The permit issued is for relatively modest work -- a $115,000 job to be done by Mr. Excavator Inc. of Kirtland to install 13 catch basins with manholes, one grease interceptor, a 784-square-foot storm and or sanitary sewer, and 120 linear feet of water distribution piping, the permit showed. MORE: https://neo-trans.blogspot.com/2021/07/first-building-permit-issued-for-city.html "In the souls of the people the grapes of wrath are filling and growing heavy, growing heavy for the vintage." -- John Steinbeck
July 15, 20213 yr BOOM! THURSDAY, JULY 15, 2021 First building permit issued for City Club Apartments tower On Wednesday, Cleveland's Building Department issued the first of what will likely be many building permits for the construction of a 23-story apartment tower at 776 Euclid Ave. downtown. It is the first documented evidence that the nearly $100 million City Club Apartments tower is about to see tangible construction activity after numerous delays. The permit issued is for relatively modest work -- a $115,000 job to be done by Mr. Excavator Inc. of Kirtland to install 13 catch basins with manholes, one grease interceptor, a 784-square-foot storm and or sanitary sewer, and 120 linear feet of water distribution piping, the permit showed. MORE: https://neo-trans.blogspot.com/2021/07/first-building-permit-issued-for-city.html Nothing makes me happier than to see a classic KJP “BOOM” open-handed smack a pessimistic thread across its face. Sent from my iPhone using Tapatalk
July 15, 20213 yr Author Thanks, but can you find a GIF of an adult, preferably a big jerk of a man, getting smacked? "In the souls of the people the grapes of wrath are filling and growing heavy, growing heavy for the vintage." -- John Steinbeck
July 22, 20213 yr well that is very good news regardless because even if city club didn’t pan out for some reason the site is still attractive and the sewer work will be prepped and ready for something to go in.
July 22, 20213 yr Author Another building permit application was submitted yesterday for the address of the City Club Apartments project, 776 Euclid Ave. but is for the parcel number (10127031) for the City Club building next door at 850 Euclid Ave. And it was submitted by David Bishoff who is president of the EV Bishoff Co., owner of the City Club Building. The only other meaningful detail associated with the application is that it is for new construction in a work area of 13,388 square feet. So the address could be wrong and instead be for a office suite/floor renovation. No dollar amount or other details were provided. "In the souls of the people the grapes of wrath are filling and growing heavy, growing heavy for the vintage." -- John Steinbeck
July 22, 20213 yr 3 hours ago, Mendo said: ^ Maybe a tempory construction office for the City Club Apartments? Nope, I'm pretty sure that office is gonna be 645 Prospect Ave.
July 27, 20213 yr Author On 7/22/2021 at 11:42 AM, KJP said: Another building permit application was submitted yesterday for the address of the City Club Apartments project, 776 Euclid Ave. but is for the parcel number (10127031) for the City Club building next door at 850 Euclid Ave. And it was submitted by David Bishoff who is president of the EV Bishoff Co., owner of the City Club Building. The only other meaningful detail associated with the application is that it is for new construction in a work area of 13,388 square feet. So the address could be wrong and instead be for a office suite/floor renovation. No dollar amount or other details were provided. BTW, the application is definitely for the City Club Apartments, not the City Club Building, because a second permit application was submitted for the same address, parcel, owner, square footage, etc except this new application shows an applicant's name -- an employee at Vocon Partners which is the apartment tower's architect. The same person, Mike Cucciarre, applied for foundation and site utilities last December..... Record B20030143: Com Building Permit Record Status: Pending Add to collection Record Info Payments Work Location 776 EUCLID AVE CLEVELAND OH 44115 Record Details Project Description: NEW CITY CLUB APTS - FOUNDATION & SITE UTILITIES - CITY CLUB APARTMENTS CONSTRUCT THE FOUNDATION AND INSTALL SITE UTILITES FOR THE NEW CITY CLUB APARTMENTS (PHASED APPROVAL ONLY) THE SHORING CONTRACTOR / CM WILL SUBMIT STAMPED SHOP DRAWINGS WITH INPUT FROM THE OWNER'S GEOTECHNICAL ENGINEER FOR AN EARTH RETENTION SYSTEM AND PROTECTION OF THE ADJACENT PROPERTIES. NO CERTIFICATE OF OCCUPANCY TO BE ISSUED WITH THIS PERMIT. Owner: CITY CLUB APARTMENTS 31700 MIDDLEBELT RD #140 FARMINGTON HILLS MI 48334 Related Contacts Responsible Party information MICHAEL CUCCIARRE 3142 PROSPECT AVE CLEVELAND, OH, 44115 Contact Phone 2165866125 E-mail: [email protected] Additional Information Number of Buildings: 1 Application Information COMMERCIAL Nature of Job Description.: Foundation Only Use Group 1: R-2 Residential - Permanent Housing - Shared Egress Construction Class: IA Certificate of Occupancy Required: No BUILDING CODE Work Area: 9810 No. of Stories/Units: 23 Bldg Footprint (SqFt): 9810 Sprinklers: Yes Fire Alarm: Yes KSQFT: 10 KFPSQFT: 10 Riser Demand: NA Sprinkler: NFPA 13 Hazard Classification: NA Code Cycle: 2017 Parcel Information Parcel Number: 10127031 Ward: 3 "In the souls of the people the grapes of wrath are filling and growing heavy, growing heavy for the vintage." -- John Steinbeck
July 27, 20213 yr Author I'll post this separately because it is important -- the city's processing of the above foundation/utilities permit application is nearly complete. But it has stopped at identifying the Project Coordinator. It confirms what I've heard that the developer is getting rid of contractors and subs that he considers too expensive and replacing them with less expensive ones. "In the souls of the people the grapes of wrath are filling and growing heavy, growing heavy for the vintage." -- John Steinbeck
August 11, 20213 yr Author Although the first permit for City Club was issued July 14, the "big permit" is being issued as we speak. This was the purpose for the first permit issued: INSTALL 13 CATCH BASIN/MANHOLES, 1 GREASE INTERCEPTOR, 784 LF STORM AND/OR SAN SEWER, 120 LF WATER DISTRIBUTION PIPING BUILDING PERMIT NO. B20030143 This is the BIG ONE that's being issued now, originally submitted last December but had stalled on an unknown matter regarding the project's coordinator..... FOUNDATION & SITE UTILITIES - NEW CITY CLUB APARTMENTS CONSTRUCT THE FOUNDATION AND INSTALL SITE UTILITIES FOR THE NEW CITY CLUB APARTMENTS (PHASED APPROVAL ONLY). THE SHORING CONTRACTOR / CM WILL SUBMIT STAMPED SHOP DRAWINGS WITH INPUT FROM THE OWNER'S GEOTECHNICAL ENGINEER FOR AN EARTH RETENTION SYSTEM AND PROTECTION OF THE ADJACENT PROPERTIES. SPECIAL INSPECTIONS ARE REQUIRED. NO CERTIFICATE OF OCCUPANCY TO BE ISSUED WITH THIS PERMIT. See, not such a slow news day after all! 😉 "In the souls of the people the grapes of wrath are filling and growing heavy, growing heavy for the vintage." -- John Steinbeck
August 11, 20213 yr Yesssssss!!!! This and SHW HQ tower going up simultaneously will dramatically change the look and feel of downtown. I can’t wait!
August 11, 20213 yr Does this mean construction will finally get started? Are the Title issues finally updated?
August 19, 20213 yr I'm starting to get real excited about the process. Just knowing another piece of paperwork has traveled from one desk/department to a different one has got me humming. Some people think the excitement is in the actual construction but us insiders know the real tension is in the paperwork.
August 20, 20213 yr Yes, construction is always better than pushing paper. I was being sarcastic but apparently too subtle in my approach. Any Clevelander who follows development in this town knows all too well announcements, renderings etc. are often followed by inaction. Who knows this time?We very well may see an exciting and unique structure break ground soon...or not. And so it goes.
August 20, 20213 yr well yeah shovels in the ground is always the thing, but we have to take events as they come and these filings put the project firmly on the map. time and rebar will tell, but its fair to celebrate here a bit i think!
August 25, 20213 yr Author Redirected from the Random Developments thread... 6 hours ago, GISguy said: This is where the CashStop used to be at 655 Prospect. They've been working on the interior for a while now. Their permit, issued June 8, is for a field office -- the address is 645 Prospect on the permit. Specifically, it reads: FIELD OFFICE - MAKE INTERIOR ALTERATIONS TO GROUND FLOOR TENANT SPACES PER APPROVED PLANS AND FIELD INSPECTION. SEPARATE ELECTRICAL PERMIT REQUIRED. CERTIFICATE OF OCCUPANCY REQUIRED. The size of the field office is roughly 3,000 square feet and has a reception area, eight offices marked as "CCA Team Offices" plus a meeting room marked as "CCA Conference Room." Pretty clear that CCA = "City Club Apartments." But there are also two offices marked as "BD Team Offices" and a meeting room identified as "BD Conference Room." Anyone know what that is? So it's pretty clear that this is for the City Club Apartments tower which has no room for a construction trailer on Euclid and the developer is leasing only the Euclid Avenue lot for the new apartment tower. They're not going to take up parking spaces in the deck for an office or the Prospect lot for a trailer office. But is certainly in a good location for nuCLEus, too. The question is, how long is Cleveland Construction's lease at this location? "In the souls of the people the grapes of wrath are filling and growing heavy, growing heavy for the vintage." -- John Steinbeck
August 26, 20213 yr Is it normal for a “temporary” field office to be so official looking, with signage and everything? I’ve never seen another one like this.
August 26, 20213 yr Gilbane had an even larger office ground level on Prospect during the Lumen Construction.
August 26, 20213 yr ^ They did, in the Hanna apartment building for anyone who doesn’t know, but they didn’t have a fancy, permanent-looking sign like that. My hovercraft is full of eels
August 26, 20213 yr Author 2 hours ago, osu4brutus03 said: So, is this a sign that construction will be coming soon? Yes. Very much so. 14 minutes ago, Jenny said: Gilbane had an even larger office ground level on Prospect during the Lumen Construction. Not surprising. Bigger building. "In the souls of the people the grapes of wrath are filling and growing heavy, growing heavy for the vintage." -- John Steinbeck
August 26, 20213 yr 3 hours ago, KJP said: But there are also two offices marked as "BD Team Offices" and a meeting room identified as "BD Conference Room." Any know what that is? maybe "business development" conference room, leveraging city club for the next major project?
August 26, 20213 yr If they roll right into City Club phase II, on the Prospect lot, they could be there for a while.