Jump to content

Featured Replies

More from Quarry Trails- focusing on MFH projects on the southbank portion of QT

IMG_20250429_175654287_AE.jpg

IMG_20250429_175922619_HDR_AE.jpg

IMG_20250429_180037468_HDR_AE.jpg

IMG_20250429_180108526_AE.jpg

IMG_20250429_180227835_AE.jpg

IMG_20250429_175620668_AE.jpg

  • Replies 207
  • Views 19.2k
  • Created
  • Last Reply

Top Posters In This Topic

Most Popular Posts

  • CbusOrBust
    CbusOrBust

    Had an extra hour at Quarry Trails, so I tried to get a few looks at as many of the ongoing projects as possible-     New MFH rising in the South Bank area of QT  

  • PrestoKinetic
    PrestoKinetic

    And here you can see condos and construction projects in their natural habitat...🤫          

Posted Images

I was told the underside of balconies can't/shouldn't be painted.

1 hour ago, aderwent said:

I was told the underside of balconies can't/shouldn't be painted.

They shouldn't be. Stain is somewhat different and some of this might be stained. But you shouldn't be painting the structural underside unless they have otherwise waterproofed above with a solid surface that will not expose them to moisture. So if the water is shedding off the deck to the rail and not down through the deck, probably fine. But if it's a traditional deck build, then it's not advisable. Holds moisture and hides deterioration If you do. And just because you shouldnt doesn't mean folks won't.

Also, the ends of some of these balconies look terrible with 4 2x10 laminated together that are uneven.

Half the siding and panels look wavy as well. Must have gone with the cheapest bid on this one.

  • 2 weeks later...

Some of the pieces of the new pedestrian bridges that will connect Quarry Trails to Riverside Drive have arrived along Trabue Rd

IMG_20250514_175005770_AE.jpg

The project currently underway that will add 21 more apartment buildings to Central Quarry Trails continues to move along at a decent pace. (These are the two rows stacked back to back- just south of the SFH's in CQT)

Got a few looks recently during a light rain...

A look down one of the alleys- with buildings 3 and 4 on the left, and 5 and 6 on the right

IMG_20250514_173848824_AE.jpg

Another look at 5 and 6

IMG_20250514_173812024_AE.jpg

Buildings 7 and 8 begin to rise-

(5 and 6 can be seen on the right)

IMG_20250514_174244885_AE.jpg

Looking north- 7 and 8 can be seen beginning to rise with another phase of SFH's going up in the distance

IMG_20250514_173918106_AE.jpg

First elevator core rising at the RockPointe site at Quarry Trails. This particular project adds 8 apartment buildings to the north bank

IMG_20250519_203442993_AE.jpg

IMG_20250519_203548202_AE.jpg

  • 2 weeks later...

Wood framing rises in the distance on building one at the RockPointe portion of Quarry Trails

IMG_20250528_124245990_AE.jpg

Looking down into central QT, heavy machinery preps for another phase of housing

IMG_20250528_124229746_AE.jpg

Create an account or sign in to comment

Recently Browsing 0

  • No registered users viewing this page.