If it goes much longer it's going to be added to the city's annual Top Ten Eyesores list.

  • Replies 514
  • Views 63.5k
  • Created
  • Last Reply

Top Posters In This Topic

Most Popular Posts

  • NorthShore64
    NorthShore64

    Makley Place (10-14-21)       Makley place Condominiums on Forsythe Avenue     Founders Park      

  • NorthShore64
    NorthShore64

    Kind and High (7-17-22)       Makley Place           Founders Park      

  • NorthShore64
    NorthShore64

    King and High (10-23-22)         Makley Place   All but one of the townhome/condo buildings along Forsythe have been completed. 

Posted Images

1 hour ago, Columbo said:

 

I asked this same question back in April 2019:

 

 

And that was after other UO posters asked the same question in 2017 and 2018(!)

 

 

Despite some posters thinking that the project was on the verge of restarting, it never did.  So, the developer/property owner running out of money or going out of business seems a likely possibility.

Oh wow, it looks like I’ve carried on a UO tradition of sorts then! 😂 Thank you so much for the information! It blows my mind that a different developer hasn’t taken over and finished the property at some point over the last few years, considering how much concrete and steel work has already been completed. 

16 hours ago, Columbo said:

 

I asked this same question back in April 2019:

 

 

And that was after other UO posters asked the same question in 2017 and 2018(!)

 

 

Despite some posters thinking that the project was on the verge of restarting, it never did.  So, the developer/property owner running out of money or going out of business seems a likely possibility.

An article was posted in Columbus underground in February of 2021 called Hundreds of New Units Approved at Busy Commission meeting which referenced this property. Briefly, the article said a new plan from JDS was approved for the site. 
 

Another article was posted in Columbus Biz First in June of 2020 called New Developer Wants to Take Over Abandoned Harrison West Project, which said JDS wanted to buy the property and scrap the bottom level retail idea and make it all apartments.

 

I can’t get my phone to input the links to the articles but a quick google search will find them. Pretty sure I’m the absolute worst millennial in all of existence when it comes to technology, so this is probably a user error on my part. Sorry for the extra steps 

37 minutes ago, smjjms said:

Pretty sure I’m the absolute worst millennial

You must be one of those "geriatric millennials" I've seen articles about.

42 minutes ago, smjjms said:

An article was posted in Columbus underground in February of 2021 called Hundreds of New Units Approved at Busy Commission meeting which referenced this property. Briefly, the article said a new plan from JDS was approved for the site. 
 

Another article was posted in Columbus Biz First in June of 2020 called New Developer Wants to Take Over Abandoned Harrison West Project, which said JDS wanted to buy the property and scrap the bottom level retail idea and make it all apartments.

 

Thanks.  I missed those articles.  Good news if JDS restarts this project.

  • 2 weeks later...

The buildings at the southwest corner of King and High are boarded up and the site is fenced. We might see demolition soon. 

1 minute ago, Pablo said:

The buildings at the southwest corner of King and High are boarded up and the site is fenced. We might see demolition soon. 

Everything is moving right along...  So many projects, it's hard to keep track of them all!!  & im loving it!

31 minutes ago, Pablo said:

The buildings at the southwest corner of King and High are boarded up and the site is fenced. We might see demolition soon. 

Is the old garage still there? I wonder if they were able to find a taker for it. 

2 hours ago, amped91 said:

Is the old garage still there? I wonder if they were able to find a taker for it. 

It’s still there but parts have been removed. 

King and High Building Will Not be Saved

 

Demolition will begin this week at the corner of King Avenue and North High Street, including the small service station that a local preservation group had hoped to save from the bulldozer.

 

Columbus Landmarks spearheaded an effort to find a user for the building, which has occupied the spot for nearly a century. The organization obtained a commitment from Subtext – the developer of the seven-story mixed-use project planned for the corner – to pay for the relocation of the building, but in the end ran into structural issues that couldn’t be overcome.

 

More below:

https://www.columbusunderground.com/king-and-high-building-will-not-be-saved-bw1/

 

King-and-High-demo-2-1150x550.jpg

"You don't just walk into a bar and mix it up by calling a girl fat" - buildingcincinnati speaking about new forumers

Demolition is underway

 

BD6CE447-31D2-4D91-A5B9-45F09E95A833.jpeg

 

The service station and Ohio Exterminating are the two piles of rubble.

092D0A59-4424-4966-A29F-E79E83AC33A0.jpeg

Thanks for the update! I’m trying to remember. The facade of the corner building is supposed to be preserved, correct?

4 minutes ago, amped91 said:

Thanks for the update! I’m trying to remember. The facade of the corner building is supposed to be preserved, correct?

I think so, along with the townhouses to the west with the angled facades.

I never realized that the corner commercial building wrapped around what looks to be a residential building. It was hidden from the street. I imagine that will also be removed to allow for the new construction leaving only the corner building.

 

image.png.6bb74e954d2987465ec4b34f4bd3a5d1.png

 

image.png.89c4fa7516c23cc7a226d2ef92bc82f7.png

I think the townhomes on King are also being demolished - in the photo above you can see an excavator taking chunks out of the back side of the building. I can't remember if those facades are being saved or not.

 

49 minutes ago, Pablo said:

I think the townhomes on King are also being demolished - in the photo above you can see an excavator taking chunks out of the back side of the building. I can't remember if those facades are being saved or not.

This photo is from the CU article about this project being approved. It looks like the facade is staying. 

8A2C093F-E283-4CBD-914C-333BDF2F0191.jpeg

22 hours ago, VintageLife said:

 

This photo is from the CU article about this project being approved. It looks like the facade is staying. 

 

 

The townhomes were also demolished. Perhaps the new build will include a façade similar to what was there.

35 minutes ago, Pablo said:

 

The townhomes were also demolished. Perhaps the new build will include a façade similar to what was there.

Hopefully, thank you for the information. 

  • 3 weeks later...

Demo work for the future King and High development appears to have completed, and the digging has begun here as well. 
 

84C03353-C420-43CA-83B8-CC0ECFAD5F69.thumb.jpeg.3ae8e1066f0abc8d2807d3d64be7ff7b.jpeg
 

0FA4A11C-0359-414A-8BCA-A25437216251.thumb.jpeg.c1b66ddba7c81f3f5a8054acc167b564.jpeg

  • 1 month later...

Noticed a hot yoga gym would be going into Makley Place called HotWorx. HotWorx posted some progress photos on insta of the inside and included this one of the patio. I still can’t tell if these patios are for the ground floor tenants or if they’re for the residents… but odd to have a patio for a hot yoga gym lol. 
 

I will say, feels like a miss not to have them connected to the ground floor retail spaces. I think one retail space even has a garage door connected to the patio. 
 

I only have driven by this, so might just take a walk by there sooner or later 

87A81EE9-09C8-44A3-9FE8-B7B977931266.png

On 12/31/2021 at 11:04 AM, smjjms said:

Noticed a hot yoga gym would be going into Makley Place called HotWorx. HotWorx posted some progress photos on insta of the inside and included this one of the patio. I still can’t tell if these patios are for the ground floor tenants or if they’re for the residents… but odd to have a patio for a hot yoga gym lol. 
 

I will say, feels like a miss not to have them connected to the ground floor retail spaces. I think one retail space even has a garage door connected to the patio. 
 

I only have driven by this, so might just take a walk by there sooner or later 

87A81EE9-09C8-44A3-9FE8-B7B977931266.png

Walked by today and looks like the patios are both connected by doors/a garage door to the leasing office. The retail spaces aren’t connected to either. 
 

So strange. 

  • 2 weeks later...

King and High moving along nicely

 

IMG_20220110_120113_0.thumb.jpg.fe392a9d5585b6d8f6cb805a1dd4fac0.jpg

  • 3 weeks later...

The building at the corner of King & High has been demolished. I noticed over the last month the outer skin, or veneer, had been removed. I wonder if they found the building had structural issues and they’re just going to rebuild it and use the salvaged brick? The vantage point is King just west of High looking southeast towards the Kroger. 

 

312F761B-40A8-4C7F-9E2F-BDEE0A5C2B8C.thumb.jpeg.a2482f18bd612a227e99db12c72c83b3.jpeg

39 minutes ago, Pablo said:

The building at the corner of King & High has been demolished. I noticed over the last month the outer skin, or veneer, had been removed. I wonder if they found the building had structural issues and they’re just going to rebuild it and use the salvaged brick? The vantage point is King just west of High looking southeast towards the Kroger. 

 

312F761B-40A8-4C7F-9E2F-BDEE0A5C2B8C.thumb.jpeg.a2482f18bd612a227e99db12c72c83b3.jpeg

That’s actually just a common method for incorporating the historic facade into a new building- carefully deconstructing and documenting the existing facade so that it can be put back up on the new building. The Hampton Inn across from the convention center was built in a similar fashion.

2 hours ago, .justin said:

That’s actually just a common method for incorporating the historic facade into a new building- carefully deconstructing and documenting the existing facade so that it can be put back up on the new building. The Hampton Inn across from the convention center was built in a similar fashion.

Yup, that’s true. I was involved with that project back in 1997 or so. There are strange window locations in some of the hotel rooms because the new floor plate didn’t always align with the old floors. 

On 1/18/2019 at 2:57 PM, ColDayMan said:

screen-shot-2019-01-17-at-45159-pm*1200x

140-unit apartment project in the University District clears commission

 

A plan to redevelop a former city school property in the University District has cleared its first hurdle.

 

Brent Wrightsel's Vision Development has worked on plans for a mixed-use project on the site of the former Fifth Avenue Elementary in Dennison Place.

 

More below:

https://www.bizjournals.com/columbus/news/2019/01/18/140-unit-apartment-project-in-the-university.html

 

Makley Place, the 5 to 6-story mixed-use complex at 210 W. 5th Avenue is now welcoming residents and commercial tenants.  According to the below linked article, the 140-unit apartment building is about 90% complete and is wrapping up construction, while 44 Makley condominiums are currently rising behind the apartment building:

 

https://www.bizjournals.com/columbus/news/2022/01/13/makley.html

 

makley-01.png.eca0613d288434e8a8fd0b979ff79b48.png

 

makley-02.png.48d9e1696533fd0c9789b604d0b4cd17.png

  • 3 weeks later...

Tower crane base at King and High. Hard to see - sorry for the poor photo. 
 

50F066CA-C948-43A2-B2AA-746CDBD8D63D.thumb.jpeg.0004ae320b97434912a91ebaf7ea3854.jpeg

2 hours ago, Pablo said:

Tower crane base at King and High. Hard to see - sorry for the poor photo. 
 

50F066CA-C948-43A2-B2AA-746CDBD8D63D.thumb.jpeg.0004ae320b97434912a91ebaf7ea3854.jpeg

What’s the count now 3-4 going up in February?

  • 4 weeks later...

Tower crane alert at King and High. 
 

19749286-8D34-45A1-B613-1B9AFDF8E1E4.thumb.jpeg.3652281d998b8d2f8cc01168e44dacf7.jpeg

3 hours ago, Pablo said:

Tower crane alert at King and High. 
 

19749286-8D34-45A1-B613-1B9AFDF8E1E4.thumb.jpeg.3652281d998b8d2f8cc01168e44dacf7.jpeg


Oh thank god! Campus has lost a couple tower cranes over the past few days so it’s great to see the supply being replenished in a timely manner. 

Tower cranes on High

 

F1706E58-D0E2-487F-8E06-AB6F6D878D7C.thumb.jpeg.da706063cdc354c432e1f4c8197b8888.jpeg

 

0D08C262-CCCB-49C4-8E43-216AAC12CD35.thumb.jpeg.14cc916e6173feddce0eb15fa5a82541.jpeg

3 hours ago, Pablo said:

Tower cranes on High

 

F1706E58-D0E2-487F-8E06-AB6F6D878D7C.thumb.jpeg.da706063cdc354c432e1f4c8197b8888.jpeg

 

0D08C262-CCCB-49C4-8E43-216AAC12CD35.thumb.jpeg.14cc916e6173feddce0eb15fa5a82541.jpeg

Earlier we were discussing what it's going to look like around here by summer...  If you take all the projects currently under construction and add all the projects about to get underway, then take all the current road construction and add all the infrastructure projects (The City of Columbus has at least 87 projects ready to go) that the Biden Infrastructure Law will fund, the entire city is going to basically be one big construction site!

 

We cannot wait to see what this place looks like in 6 or 7 months!!

Edited by Luvcbus

  • 3 weeks later...

I had never realized how big the Founders Park development is, until I drove around it today. Most of the SFH appear to be wrapping up construction and the second row of townhomes is now coming up. 
 

8EAF7169-C13E-49A7-96C0-FCAF276454BA.thumb.jpeg.084aae99225ccbf9e430be9d445db79c.jpeg

 

9CD66108-A775-4FCD-B9BB-DC9B2E75DA3E.thumb.jpeg.260074f8baeef7aaee154fe6bffdd911.jpeg

 

A little further east on 5th, work on more townhomes as part of the Makley Place development has started. 
 

07CE5A61-ED58-440D-9E2C-14AE7666189A.thumb.jpeg.cfe2909c3b3999295df6fb09a90c5eca.jpeg

8 minutes ago, amped91 said:

I had never realized how big the Founders Park development is, until I drove around it today. Most of the SFH appear to be wrapping up construction and the second row of townhomes is now coming up. 
 

8EAF7169-C13E-49A7-96C0-FCAF276454BA.thumb.jpeg.084aae99225ccbf9e430be9d445db79c.jpeg

 

9CD66108-A775-4FCD-B9BB-DC9B2E75DA3E.thumb.jpeg.260074f8baeef7aaee154fe6bffdd911.jpeg

 

A little further east on 5th, work on more townhomes as part of the Makley Place development has started. 
 

07CE5A61-ED58-440D-9E2C-14AE7666189A.thumb.jpeg.cfe2909c3b3999295df6fb09a90c5eca.jpeg

The single family homes look lovely. I am afraid to ask about how much they will be selling for though.  I can't see much regarding color but I can see they at least have some tweaks in the rooflines and gables and all to have some variety and they have that nice older "sturdy" look to them. I am sure they will look great when the landscaping fills in. 

4 minutes ago, Toddguy said:

The single family homes look lovely. I am afraid to ask about how much they will be selling for though.  I can't see much regarding color but I can see they at least have some tweaks in the rooflines and gables and all to have some variety and they have that nice older "sturdy" look to them. I am sure they will look great when the landscaping fills in. 

I was in shock seeing how much they wanted for the for sale units in the Quarry Trail development. I’m not even going to look these ones up. 😂

39 minutes ago, amped91 said:

I was in shock seeing how much they wanted for the for sale units in the Quarry Trail development. I’m not even going to look these ones up. 😂

I looked up some of the townhome units....*sigh*.  A mistake. I don't want to know about the SFH amounts.

The SFH start at $722K at around 1900SF.

10 minutes ago, Pablo said:

The SFH start at $722K at around 1900SF.

Oh lord. 

  • 3 months later...

Kind and High (7-17-22)

400923861_CLB_7-16-22(320).thumb.jpg.09defe8f54619c190e64821374959da5.jpg

 

1909595335_CLB_7-16-22(323).thumb.jpg.a5922d210a2bbfd2f8c3fe2d0c1d7d1d.jpg

 

1254878839_CLB_7-16-22(325).thumb.jpg.9b8d99abaea12bf988f6e7147a01ac91.jpg

 

Makley Place

416618907_CLB_7-16-22(259).thumb.jpg.6eeea5d9e986eee17e4ebdc04e91ffc1.jpg

 

1894156269_CLB_7-16-22(261).thumb.jpg.2ad5d384f76c748210a6cfbd5fffd40e.jpg

 

1340486832_CLB_7-16-22(262).thumb.jpg.0237683bbba4520f6c24b1bc2602dd4f.jpg

 

1888975866_CLB_7-16-22(263).thumb.jpg.658b104d5fff7a8a7ca6da329992cd0b.jpg

 

1521895801_CLB_7-16-22(266).thumb.jpg.2869d7bde5940e19134e861cd98a9fc8.jpg

 

Founders Park

2023223773_CLB_7-16-22(268).thumb.jpg.e265de1883a125abe22cca9e0bd04830.jpg

 

970482450_CLB_7-16-22(269).thumb.jpg.5ab9b40b391d6a44b03bb8a4e7fc548f.jpg

 

148384124_CLB_7-16-22(272).thumb.jpg.b92c30631d51eda9ff0936818cc548bb.jpg 

 

556401402_CLB_7-16-22(274).thumb.jpg.77b1f29f48fc9a453b3e8c05a11294d8.jpg

 

151795903_CLB_7-16-22(277).thumb.jpg.026eb60e5d2c59151ad96e3c51526034.jpg

 

1121482192_CLB_7-16-22(275).thumb.jpg.6286e0559604a3bd5d396fc373e22fb4.jpg

 

1679476812_CLB_7-16-22(279).thumb.jpg.80ac76d8251ed7616f57b48f1b0f7b7b.jpg

2 hours ago, NorthShore647 said:

Kind and High (7-17-22)

400923861_CLB_7-16-22(320).thumb.jpg.09defe8f54619c190e64821374959da5.jpg

 

1909595335_CLB_7-16-22(323).thumb.jpg.a5922d210a2bbfd2f8c3fe2d0c1d7d1d.jpg

 

1254878839_CLB_7-16-22(325).thumb.jpg.9b8d99abaea12bf988f6e7147a01ac91.jpg

 

Makley Place

416618907_CLB_7-16-22(259).thumb.jpg.6eeea5d9e986eee17e4ebdc04e91ffc1.jpg

 

1894156269_CLB_7-16-22(261).thumb.jpg.2ad5d384f76c748210a6cfbd5fffd40e.jpg

 

1340486832_CLB_7-16-22(262).thumb.jpg.0237683bbba4520f6c24b1bc2602dd4f.jpg

 

1888975866_CLB_7-16-22(263).thumb.jpg.658b104d5fff7a8a7ca6da329992cd0b.jpg

 

1521895801_CLB_7-16-22(266).thumb.jpg.2869d7bde5940e19134e861cd98a9fc8.jpg

 

Founders Park

2023223773_CLB_7-16-22(268).thumb.jpg.e265de1883a125abe22cca9e0bd04830.jpg

 

970482450_CLB_7-16-22(269).thumb.jpg.5ab9b40b391d6a44b03bb8a4e7fc548f.jpg

 

148384124_CLB_7-16-22(272).thumb.jpg.b92c30631d51eda9ff0936818cc548bb.jpg 

 

556401402_CLB_7-16-22(274).thumb.jpg.77b1f29f48fc9a453b3e8c05a11294d8.jpg

 

151795903_CLB_7-16-22(277).thumb.jpg.026eb60e5d2c59151ad96e3c51526034.jpg

 

1121482192_CLB_7-16-22(275).thumb.jpg.6286e0559604a3bd5d396fc373e22fb4.jpg

 

1679476812_CLB_7-16-22(279).thumb.jpg.80ac76d8251ed7616f57b48f1b0f7b7b.jpg

Glad you're back to chronical development around town, @NorthShore647!

  • 4 weeks later...

Been a minute since we’ve heard about this one. 
 

Italian Village developer Kevin Lykens moves forward with redevelopment of Harrison West pipe organ factory

 

1D5C5F4D-A924-4AF9-8DB5-B1B0D72F648B.jpeg.21fb01a67e12ecd087468cb7006801da.jpeg

 

“Veteran Italian Village developer Kevin Lykens is moving toward a fall construction start on his redevelopment of a former pipe organ factory. 

 

The Bunn-Minnick building, which manufactured and restored pipe organs at 875 Michigan Ave. in Harrison West, closed in 2018.

 

Lykens, owner of Lykens Cos., wants to turn the old factory into apartments. The historic building will have 27 units and a newly built building behind it will have 28 units. There will be a mix of studio, one and two bedroom apartments. Lykens expects the project will cost about $12 million. 
 

Columbus City Council approved the rezoning for the project in 2021. Lykens said he's still waiting on permits for the original building part of project, but expects to hear back within the next month or so and break ground this fall. Lykens bought the site in 2018, according to the Franklin County Auditor.”

 

https://www.bizjournals.com/columbus/news/2022/08/18/harrison-west-pipe-organ-factory-kevin-lykens.html

2 hours ago, amped91 said:

Been a minute since we’ve heard about this one. 
 

Italian Village developer Kevin Lykens moves forward with redevelopment of Harrison West pipe organ factory

 

1D5C5F4D-A924-4AF9-8DB5-B1B0D72F648B.jpeg.21fb01a67e12ecd087468cb7006801da.jpeg

 

“Veteran Italian Village developer Kevin Lykens is moving toward a fall construction start on his redevelopment of a former pipe organ factory. 

 

The Bunn-Minnick building, which manufactured and restored pipe organs at 875 Michigan Ave. in Harrison West, closed in 2018.

 

Lykens, owner of Lykens Cos., wants to turn the old factory into apartments. The historic building will have 27 units and a newly built building behind it will have 28 units. There will be a mix of studio, one and two bedroom apartments. Lykens expects the project will cost about $12 million. 
 

Columbus City Council approved the rezoning for the project in 2021. Lykens said he's still waiting on permits for the original building part of project, but expects to hear back within the next month or so and break ground this fall. Lykens bought the site in 2018, according to the Franklin County Auditor.”

 

https://www.bizjournals.com/columbus/news/2022/08/18/harrison-west-pipe-organ-factory-kevin-lykens.html


Didn’t even know about this project. It would be awesome if they could transform like 10-15 other old factories into apartments like they did with Wonder Bread. Love the way those loft style apartments look.

Nice to see that property get some new life, and a full transformation at that. The last thing that it housed was a failed charter school. Apartments are definitely a better use for it.

 

Now if only someone would do something about that unfinished eyesore at 840 Michigan. It sticks out like a sore thumb in a neighborhood that has seen so much new investment during the past decade.

19 hours ago, 614love said:


Didn’t even know about this project. It would be awesome if they could transform like 10-15 other old factories into apartments like they did with Wonder Bread. Love the way those loft style apartments look.

It just makes so much sense. Turn the old factories into super cool loft apartments or condos and manufacturing can move into the new style manufacturing building that are designed for efficiency and to maintain cleanliness way easier than these old buildings that require an insane amount of upkeep now.

20 hours ago, 614love said:


Didn’t even know about this project. It would be awesome if they could transform like 10-15 other old factories into apartments like they did with Wonder Bread. Love the way those loft style apartments look.

I love The Fort building on south high, but damn I wish they turned some of their units into apartments or some for sale units. It is such an amazing building and the space is huge. 

On 8/18/2022 at 8:18 PM, NEOBuckeye said:

Now if only someone would do something about that unfinished eyesore at 840 Michigan. It sticks out like a sore thumb in a neighborhood that has seen so much new investment during the past decade.

It’s really surprising to me no one has bought that property up and finished construction, especially with how much more expensive materials have been—half the material is already there. 

On 8/21/2022 at 8:59 AM, smjjms said:

A building permit is under review. It says it's for a 54-unit building with a garage underneath using the existing structure.

 

Final_With-People_resized.jpg

Edited by aderwent
adding a picture

Do you know of the timeline for that submission? Just curious if it’s the same one from a year ago, or if the project is actually active 

26 minutes ago, smjjms said:

Do you know of the timeline for that submission? Just curious if it’s the same one from a year ago, or if the project is actually active 

There was never a building permit from a year ago. This is current.