August 11, 20231 yr 1 hour ago, VintageLife said: Need to get those painted with some murals asap, otherwise they will have to be paint over the graffiti every week. I literally thought the exact same thing looking at those photos. Hopefully there is some plan for that. Heck, embrace the graffiti and create our own version of Wynwood Walls here.
August 11, 20231 yr 6 hours ago, VintageLife said: Need to get those painted with some murals asap, otherwise they will have to be paint over the graffiti every week. I was just going to say this would make a great place for some public art/a pocket park!
August 21, 20231 yr I know it's somewhere in these 9 pages but what exactly is the layout of this new I-70/I-71/Rt. 315 interchange? "You don't just walk into a bar and mix it up by calling a girl fat" - buildingcincinnati speaking about new forumers
August 21, 20231 yr 7 hours ago, ColDayMan said: I know it's somewhere in these 9 pages but what exactly is the layout of this new I-70/I-71/Rt. 315 interchange?
August 21, 20231 yr Thanks! "You don't just walk into a bar and mix it up by calling a girl fat" - buildingcincinnati speaking about new forumers
August 26, 20231 yr This particular phase of the Downtown Ramp Up project is going to be such a drastic change Looking west Looking east From Mound and Short One from a little further west
August 27, 20231 yr 56 minutes ago, John7165 said: Any idea when all of the road construction is supposed to be done? If you're asking about the Downtown Ramp Up project specifically: ODOT has construction scheduled through at least 2026, according to the factsheet. Work on the proposed Third, Fourth, and High street connections will begin in 2024. A few upcoming phases haven't received funding as of yet, but that should just be a formality. (I wouldn't expect the Downtown Ramp Up project to be completely finished til after 2030) There's lots of good info found in these links: https://www.nbc4i.com/news/local-news/columbus/how-rebuilding-of-i-70-71-will-affect-downtown-columbus-streets/ https://www.transportation.ohio.gov/projects/projects/105523 https://www.transportation.ohio.gov/projects/mega-projects/mega-projects/downtown-ramp-up#:~:text=Project Description,direction on I-70%2F71
August 31, 20231 yr Pieces of the new freeway continue to arrive along Short Street for the Downtown Ramp Up project
September 7, 20231 yr (Not sure if this is the best place for this?) "Traffic through downtown Columbus will be rerouted this weekend as crews work on part of a key bridge. I-70 will be closed in both directions between State Route 315 and I-71 from 11:00 p.m. Friday until 5:00 a.m. Monday while crews install beams on a bridge that will eventually carry traffic from Fulton Street onto I-70 eastbound. This is part of the latest phase of the massive $1.4 billion Downtown Ramp Up series of projects reconstructing Interstates 70/71 in downtown Columbus to alleviate safety and congestion problems along one of the busiest traffic corridors in the state." The Front Street bridge will also be demolished this weekend while the freeway is closed. https://sunny95.com/news/061160-i-70-closed-downtown-for-the-weekend/
September 7, 20231 yr 1 hour ago, Luvcbus said: (Not sure if this is the best place for this?) "Traffic through downtown Columbus will be rerouted this weekend as crews work on part of a key bridge. I-70 will be closed in both directions between State Route 315 and I-71 from 11:00 p.m. Friday until 5:00 a.m. Monday while crews install beams on a bridge that will eventually carry traffic from Fulton Street onto I-70 eastbound. This is part of the latest phase of the massive $1.4 billion Downtown Ramp Up series of projects reconstructing Interstates 70/71 in downtown Columbus to alleviate safety and congestion problems along one of the busiest traffic corridors in the state." The Front Street bridge will also be demolished this weekend while the freeway is closed. https://sunny95.com/news/061160-i-70-closed-downtown-for-the-weekend/ I drive along/through this stretch everyday for work, and the construction/detours/closures have been getting exhausting. Still though, it's encouraging to see tangible process made. Looking at those untopped support beams has an unsettling effect on me.
September 8, 20231 yr More random ones from the southern edge of downtown- as parts of the Downtown Ramp Up project continue From Dodge Park From Mound St From Main St bridge
September 8, 20231 yr Project Update: Front Street Bridge to be Demo’d This Weekend as I-70 Work Continues Work continues on the multi-year, multi-billion dollar effort to untangle the I-70/71 split Downtown. This weekend, the South Front Street bridge that connects Downtown to the Brewery District will be demolished, meaning I-70 will be closed in both directions between State Route 315 and I-71 through September 11. The Ohio Department of Transportation (ODOT) is suggesting drivers use I-670 as a detour. After the demolition, a new, wider bridge will be constructed with landscaped sidewalks and a park-like walkway on one side. The new bridge, which will also feature two-way vehicular traffic, is scheduled to be completed by spring of 2025. More below: https://columbusunderground.com/project-update-front-street-bridge-to-be-demod-this-weekend-as-i-70-work-continues-bw1/ "You don't just walk into a bar and mix it up by calling a girl fat" - buildingcincinnati speaking about new forumers
September 11, 20231 yr The old Front St bridge is history And a few more of the new freeway exit as it begins to take shape
September 11, 20231 yr At various times, I lived and worked in the blocks north and south of the Front Street bridge and walked over it frequently, sometimes with groceries from Kroger. It was a terrible experience in every possible way between the uneven sidewalks (later covered with asphalt), worn-out chain-link fence, free-flowing left turn from the highway ramp, and noisy traffic below.
September 20, 20231 yr Crews are currently installing part of the new freeway that will cross over Short Street near W Mound
October 1, 20231 yr Bunch of random ones of the new freeway rising as part of the Downtown Ramp Up project
October 12, 20231 yr Had a free hour while in the Brewery District earlier- Got a bunch of random ones from the Downtown Ramp Up project
October 15, 20231 yr Snatched a few more quick ones of the new freeway being built just south of downtown as I drove through Also got a few of the new ramp being built between 71 and the river for 71 northbound
October 29, 20231 yr Few more looks at some of the new freeway as part of the Downtown Ramp Up project Heading east (in order)
October 30, 20231 yr Est. Const. Cost: $1,400,000,000 Begin Construction: Summer 2010 End Construction: TBD Could you imagine the outrage if this was a rail or transit project?
October 30, 20231 yr 9 hours ago, greenville2 said: Est. Const. Cost: $1,400,000,000 Begin Construction: Summer 2010 End Construction: TBD Could you imagine the outrage if this was a rail or transit project? And what is the maintenance cost going forward -- has it been decreased by this project? These are questions that should be asked up front in any new infrastructure project but rarely seem to be part of the discussion.
October 30, 20231 yr 11 hours ago, greenville2 said: Est. Const. Cost: $1,400,000,000 Begin Construction: Summer 2010 End Construction: TBD Could you imagine the outrage if this was a rail or transit project? If it were rail, every news outlet would have pages of stories about how its a massive boondongle and drain on the tax base. But yeah, billions on 2 miles of freeway with 1/4 the life expectancy of rail... looking good!
November 11, 20231 yr Construction seemingly everywhere near Mound St as part of the Downtown Ramp Up project
November 12, 20231 yr Snatched some more of the Downtown Ramp Up project on my way through about an hour ago. What a drastic change this will be!
November 15, 20231 yr More from Downtown Ramp Up Parts of the new freeway can be seen in the distance from Scioto Audubon MP
November 24, 20231 yr Got some more random ones of the Downtown Ramp Up project on my way through today
December 12, 20231 yr More randoms of the new freeway rising on the southern edge of downtown as part of the Downtown Ramp Up
December 15, 20231 yr Anybody know the reason why they left the bridge and ramp for I-70 West over Parsons incomplete? Below is the image from ODOT showing how phase 2E was supposed to include the new bridge/ramp for I-70 West with the old one to be removed.
December 17, 20231 yr On 12/15/2023 at 12:00 PM, KyleofColumbus said: Anybody know the reason why they left the bridge and ramp for I-70 West over Parsons incomplete? Below is the image from ODOT showing how phase 2E was supposed to include the new bridge/ramp for I-70 West with the old one to be removed. There's still numerous phases to go, including some near Children's that will include the Parsons Ave rebuild.
December 19, 20231 yr On 12/15/2023 at 12:00 PM, KyleofColumbus said: Anybody know the reason why they left the bridge and ramp for I-70 West over Parsons incomplete? Below is the image from ODOT showing how phase 2E was supposed to include the new bridge/ramp for I-70 West with the old one to be removed. ODOT will replace the WB I-70 bridge in a later phase. The alignment of SB I-71 to EB I-70, Parsons Avenue, and the current bridge of Main Street over I-71 did not allow for it to be done. The future SB I-71 to EB I-70 ramp will go in that trench on the lower middle side.
January 2, 20241 yr Numerous new ramps beginning to rise south of downtown as part of the Downtown Ramp Up project You can see another one beginning to rise in the distance-
January 4, 20241 yr Looks like crews will be setting beams on the new I-71 SB flyover ramp this weekend! https://content.govdelivery.com/accounts/OHDOT/bulletins/3831809
January 5, 20241 yr Few more looks from the southern edge of Downtown as progress continues on the Downtown Ramp Up project
January 7, 20241 yr On 1/4/2024 at 5:28 PM, CbusOrBust said: Looks like crews will be setting beams on the new I-71 SB flyover ramp this weekend! https://content.govdelivery.com/accounts/OHDOT/bulletins/3831809 More beams set on the new 71 SB flyover ramp south of Downtown