Jump to content

Featured Replies

Wouldn't  a newly recorded mortgage be the best indicator that construction is about to begin?

 

Is there one recorded?

  • Replies 2.1k
  • Views 312.1k
  • Created
  • Last Reply

Top Posters In This Topic

Most Popular Posts

  • To do that, we would need to refurbish the May Company building with hundreds of residences, turn Tower City into a massive business incubator with some high-profile tenants, add another high-rise apa

  • mrclifton88
    mrclifton88

    The new entrance is open but not fully activated.  Looks nice!

  • ASPhotoman
    ASPhotoman

    Some iPhone photos of a tour I took today. So here are some take-a-ways.    1. The balcony level is fully leased and currently has a five year waiting list. 2. The color schemes of each

Posted Images

Sorry, I was being rhetorical. It is my understanding that lenders do not allow construction to begin until the mortgage and notice of commencement have been recorded. Unfortunately, I'm too busy to keep an eye on the land records in the recorder's office.

^From some of Michelle's past reporting, sounds like there's a bit of recording lag in Cuyahoga County, so we might not see it pop up on line for several days after the mortgage is executed and the title insurer issues its policy. But you are correct that there's no way a construction lender will let money out the door without an executed mortgage, so seeing one would be a terrific sign.

^From some of Michelle's past reporting, sounds like there's a bit of recording lag in Cuyahoga County, so we might not see it pop up on line for several days after the mortgage is executed and the title insurer issues its policy. But you are correct that there's no way a construction lender will let money out the door without an executed mortgage, so seeing one would be a terrific sign.

 

Turn around at our office's recording matters is usually about 36 hours.

Well tomorrow is Sept. 1st, so it looks like an August start is off the table.

Here here! 

 

^YAB0713 has to be wetting himself :wink:

I peed a little, so what? Htsguy[/member]

Just walked by. That is VERY clearly a construction office... AND all the streetlights around the building have been removed in preparation. It's really happening!

Parked nearby today and hyperventilated while walking by. Being the nosey a**hole I am, I stopped and asked someone how long before the crane gets there and he told me sometime next week is what they're aiming for...

Nice investigative work YABO! Does anyone recall what the construction timeline looks like?

Parked nearby today and hyperventilated while walking by. Being the nosey a**hole I am, I stopped and asked someone how long before the crane gets there and he told me sometime next week is what they're aiming for...

 

I have a funny feeling that in a couple of weeks your picture is going to be posted on the construction office bulletin board and underneath it is going to say "turn and run away fast when you see this guy".

Parked nearby today and hyperventilated while walking by. Being the nosey a**hole I am, I stopped and asked someone how long before the crane gets there and he told me sometime next week is what they're aiming for...

 

I have a funny feeling that in a couple of weeks your picture is going to be posted on the construction office bulletin board and underneath it is going to say "turn and run away fast when you see this guy".

 

In a couple of weeks? I was detained and tasered upon entering the premises today.... Worth it for a hot scoop though

Parked nearby today and hyperventilated while walking by. Being the nosey a**hole I am, I stopped and asked someone how long before the crane gets there and he told me sometime next week is what they're aiming for...

 

I have a funny feeling that in a couple of weeks your picture is going to be posted on the construction office bulletin board and underneath it is going to say "turn and run away fast when you see this guy".

 

In a couple of weeks? I was detained and tasered upon entering the premises today.... Worth it for a hot scoop though

 

What do you think you'll be arrested for first?  Trespassing, or public urination?  :-D

^I'll save the indictments for completion of the project.

 

In all seriousness though, this will be nice if they could get the crane up for the Tribe's playoff run.

So this is the fourth 20+ story building under construction downtown since 2000. Sorry, I was in Toronto a couple weekends ago. Not impressed. :)

 

Downtown needs to have four 20+ story buildings under construction at this time next year -- The Beacon, Playhouse Square tower, nuCLEus, and Sherwin Williams. I'm pissed that #5 (Medical Mutual) isn't going to be part of this mix.

"In the souls of the people the grapes of wrath are filling and growing heavy, growing heavy for the vintage." -- John Steinbeck

So this is the fourth 20+ story building under construction downtown since 2000. Sorry, I was in Toronto a couple weekends ago. Not impressed. :)

 

Downtown needs to have four 20+ story buildings under construction at this time next year -- The Beacon, Playhouse Square tower, nuCLEus, and Sherwin Williams. I'm pissed that #5 (Medical Mutual) isn't going to be part of this mix.

 

Perhaps an in depth discussion is best in a different thread, but my sources at S-W indicate that the new HQ seems less likely now than it did 6 months ago.

So this is the fourth 20+ story building under construction downtown since 2000. Sorry, I was in Toronto a couple weekends ago. Not impressed. :)

 

Downtown needs to have four 20+ story buildings under construction at this time next year -- The Beacon, Playhouse Square tower, nuCLEus, and Sherwin Williams. I'm pissed that #5 (Medical Mutual) isn't going to be part of this mix.

 

Agreed. All this freaking out over a 20 story addition is kind of strange. Yes, it's a start, but not an impressive one.

So this is the fourth 20+ story building under construction downtown since 2000. Sorry, I was in Toronto a couple weekends ago. Not impressed. :)

 

Downtown needs to have four 20+ story buildings under construction at this time next year -- The Beacon, Playhouse Square tower, nuCLEus, and Sherwin Williams. I'm pissed that #5 (Medical Mutual) isn't going to be part of this mix.

 

Agreed. All this freaking out over a 20 story addition is kind of strange. Yes, it's a start, but not an impressive one.

 

What's strange is the construction of a 20 story addition. It's quite ok for us to get freaked out over the first downtown all residential high rise in how many decades?  Seriously, how long has it been?

So this is the fourth 20+ story building under construction downtown since 2000. Sorry, I was in Toronto a couple weekends ago. Not impressed. :)

 

Downtown needs to have four 20+ story buildings under construction at this time next year -- The Beacon, Playhouse Square tower, nuCLEus, and Sherwin Williams. I'm pissed that #5 (Medical Mutual) isn't going to be part of this mix.

 

I would rather have 6-story buildings on all of the downtown surface parking lots first.

So this is the fourth 20+ story building under construction downtown since 2000. Sorry, I was in Toronto a couple weekends ago. Not impressed. :)

 

Downtown needs to have four 20+ story buildings under construction at this time next year -- The Beacon, Playhouse Square tower, nuCLEus, and Sherwin Williams. I'm pissed that #5 (Medical Mutual) isn't going to be part of this mix.

 

I would rather have 6-story buildings on all of the downtown surface parking lots first.

 

To this end, I hope the Beacon is a rousing success.  Maybe those surface lots can become 6 story parking structures with ground level retail, with future towers planned on top of them. 

Once you build a bunch of six-story bldgs its hard to turn them into 20-40 stories....so be careful what you wish for.

Well it is technically Sept, but via a confidental source, ALL financing has closed as of this morning.  Full steam ahead -- Godspeed everyone.

Since it appears that groundbreaking will be in September, how long will construction last?

From what I remember of similarly sized projects that had to build a foundation first -- two years. So I would expect this to be done in 12-18 months.

"In the souls of the people the grapes of wrath are filling and growing heavy, growing heavy for the vintage." -- John Steinbeck

In response to KJP, no matter how much is constructed or restored, developed as new areas of nightlife, or created as new plazas with fantastic views, etc., in Cleveland, even more if this goes on in Toronto.  Also Boston, San Francisco, etc.  the thing is these developments - such as In Tremont (including Duck Island), Ohio City (including Hingetown), and Detroit Shoreway (including Gordon Square) -are doing a great deal to upgrade the general character abd image of Cleveland, while these other cities have had their enviable characters and images for a long time. Yes, a 20-storey highrise attracts virtually no attention, as to its height, in many parts of Toronto.  In much of Manhattan it's a "lowrise."

Just because the answer is obvious does not mean I don't have a right to complain.

"In the souls of the people the grapes of wrath are filling and growing heavy, growing heavy for the vintage." -- John Steinbeck

Construction fencing delivered today.  There is a flatbed truck outside with fencing on it.  We should see the coveted crane soon.

Anybody seeing any new activity?

Also, Hecks express looks to be opening very soon.

There are also "sidewalk closed" signs which will likely be in place very shortly.

Today at lunch, I saw construction barrels in front of the building along Euclid.  They were preventing cars from parking in the parking spots in front of the building.

 

Definitely feels like we're getting close!!!

The County Auditor shows a transfer in ownership as of September 1. 

Here's our confirmation! 

 

Euclid Avenue will temporarily close to east and west bound traffic September 11-17, 2017. The closure extends from East 6th Street to East Roadway. It allows a crane to be placed atop a parking garage at 515 Euclid Avenue.

 

September 11-17:

 

Local traffic will have access to Euclid Avenue from East 3rd Street north traveling east bound on Euclid to East 4th Street to access the residential parking garage on East 4th Street. Access will be allowed for traffic exiting the residential garage on 4th Street to Euclid west bound to East Roadway at Public Square.

 

Traffic will not be allowed access onto Euclid from Public Square and no traffic will be allowed access west bound beyond East 6th Street on Euclid Avenue during this temporary closure. All traffic traveling west bound on Euclid Avenue from East 9th Street will be detoured onto East 6th Street.

 

Pedestrians on the north side of Euclid Avenue must cross at East 6th Street to the south side of Euclid Avenue, and may cross back to the north side of Euclid Avenue at East 4th Street.

 

RTA will publish a schedule to divert bus traffic around Euclid from East 9th to Public Square during the temporary closure as well.

 

After September 17:

 

Euclid Avenue will reopen to two way traffic beginning September 18. East bound traffic will observe the normal traffic flow. One lane will remain open for all traffic traveling west bound on Euclid Avenue between East 6th street and East 4th street.

 

The project is scheduled for completion in February 2019. Expect additional traffic notices as work progresses.

 

https://clecityhall.com/2017/09/05/temporary-road-closure-announced-for-euclid-ave-beginning-sept-11/

I told everyone to remain calm.  In 18 months when this thing is completed, all of the fussing about a late will seem silly.

AWESOME

I told everyone to remain calm.  In 18 months when this thing is completed, all of the fussing about a late will seem silly.

 

c3bfbc7743f422d7f4633e461fc41bc7.jpg

"In the souls of the people the grapes of wrath are filling and growing heavy, growing heavy for the vintage." -- John Steinbeck

Opening in a couple weeks. Also breakfast!

I'd just like to say thank you to whoever decided to open Heck's Express during construction. Bless you.

Euclid reroute information going around office this morning.  :wave:

Euclid reroute information going around office this morning.  :wave:

 

*I didn't overhear anyone in the office verbally gripe about the closure, which surprised me.

^ wait until it actually closes and everyone will start complaining that it took them 3 minutes longer to get to where they were going. 

Ch 3 story on the beacon

Gonna be so great to see a crane downtown while watching the "Windians " this fall. Maybe a somewhat modest start but a good look for the city.  Hope the Playhouse Square Tower crane isn't far  behind.

================!

|

|

|

|

|

|

|

|

|

|

__

 

 

 

 

Soon    (^That's a crane)                           

^ you never doubted me YABO713[/member].  It might not be August but it's happening.

lol down4cle[/member] I kept the faith. What would be REALLY cool is if the City doesn't hold up PHS tower too long and we can have two cranes in the sky at the same time by May.

Create an account or sign in to comment

Recently Browsing 0

  • No registered users viewing this page.