I literally just caught up with all of this. This is insane! That building is beautiful and fits Grandview Ave. perfectly. 

 

Exactly what hurdles does this have to cross to get approved? City Council? I hope it gets approved......

  • 4 weeks later...
  • Replies 463
  • Views 50.7k
  • Created
  • Last Reply

Top Posters In This Topic

Most Popular Posts

  • Some pictures of Little Grand Market at Grandview Crossing   Grand opening scheduled for Aug. 16           https://www.bizjournals.com/c

  • The Edington on W. 1st at Fairview appears close to completion. Pretty good looking building.   

  • Recent aerial view of Grandview Crossing     

Posted Images

Construction to start soon on next piece of Grandview Crossing 

 

Columbus developer Thrive Cos. is seeking an incentive for the first building on the city's side of 56-acre Grandview Crossing.

 

More below:

https://www.bizjournals.com/columbus/news/2020/01/31/construction-to-start-soon-on-next-piece-of.html

 

gRANDVIEW.jpg?w=708&h=355&crop=1&resize=

"You don't just walk into a bar and mix it up by calling a girl fat" - buildingcincinnati speaking about new forumers

  • 2 weeks later...
On 2/2/2020 at 10:58 PM, ColDayMan said:

Construction to start soon on next piece of Grandview Crossing 

 

Columbus developer Thrive Cos. is seeking an incentive for the first building on the city's side of 56-acre Grandview Crossing.

 

More below:

https://www.bizjournals.com/columbus/news/2020/01/31/construction-to-start-soon-on-next-piece-of.html

 

gRANDVIEW.jpg?w=708&h=355&crop=1&resize=

 

A little more about this project from the article:

 

-- Columbus developer Thrive Cos. is set to start construction in February on the first of two 124,000-square-foot office buildings on the Columbus side of the 56-acre Grandview Crossing mixed-use development.  The $19.2 million four-story speculative office building is estimated to open in June 2021.

 

-- The CIty of Grandview Heights gave its approval last fall to plans for the first retail buildings on its side of the development.

 

-- Construction for a parking garage is expected to start in March.  The project team has also applied for the building permit on a 104-unit apartment building on the Columbus side.

 

-- Thrive and Gallas Zadeh Development overall plan to build 1,000 residential units, 248,000 square feet of office space, 108,000 square feet of retail space, a 47,000-square-foot gym, 120-bed hotel, 1,177-space parking garage and 1,818 surface parking spaces on the long-vacant former landfill near Dublin Road and Grandview Avenue.

  • 2 weeks later...

^Good spot for a light rail station - next stop the Arena District. ?

  • 3 weeks later...
On 1/7/2020 at 12:58 PM, jonoh81 said:

 

It's literally on the line, but Grandview residents argued against that project too, so they certainly view it as part of Grandview, similarly to how most people see High Street as part of German Village even though it technically not.  Obviously this would have an impact on what gets approved, but Grandview states in their own development plan for Grandview Avenue that they want this type of density, only to argue against it when they get those proposals.   

I LOVE that article of yours!

  • 2 months later...

MODERATOR NOTE:  The Dispatch just posted an article about the status of various development projects around Columbus and Central Ohio.  The status of some of these projects have already been posted in other threads.  For those projects that haven't already been updated, I'll post an update from the article in the appropriate thread.

 


Here's an update for the huge mixed-use Grandview Crossing project from the below linked article:

 

https://www.thisweeknews.com/business/20200523/some-major-columbus-development-projects-on-hold-while-others-move-forward

 

Quote

A hotel planned for Wagenbrenner’s Grandview Crossing development also will be pushed back at least a year, he said.

 

“We’ve postponed the one hotel project, but the residential remains strong, unbelievably strong considering what we’ve been through,” he said.

 

Wagenbrenner said he expects a hotel to eventually be built at Grandview Crossing.

 

  • 4 weeks later...

1229 Grandview Ave project is back with a few tweaks.

Quote

The developer removed the rear setback, cut seven units and 21% of the building mass from the previous design, while increasing commercial space. The fourth-floor portion of the development is set back from the front and rear, and the project now is 28,500 square feet with 47 parking spaces.

https://www.bizjournals.com/columbus/news/2020/06/18/proposed-grandview-development-gets-a-new-look.html?cx_testId=7&cx_testVariant=cx_31&cx_artPos=1#cxrecs_s

 

image.thumb.png.31a775778c5fa33d34eb586800338dfb.png

On 11/21/2019 at 12:07 AM, futureman said:

1229GrandviewAve-MixUse-2019.thumb.jpg.7f445fdc9c537834f41261542a1d9bd2.jpg

 

A new mix use building is being proposed at 1229 Grandview Ave. It will replace two house that site between one story commercial properties near the Grandview Theater. I really like how it looks and think it'll enhance the area ... but then again I don't live behind it. It looks like it basically sits on the property lines with the houses behind it and will balconies overlooking their backyards.

 

Here's some of the details -

  • 4 stories, 1st floor commercial/retail and parking garage
  • 29 residential units, ~1500sf of commercial/retail on ground floor.
  • 46 parking spots using a lifts. I believe Carlyle Watch mix-use project downtown (2007) used something similar. 
  • According the documents filled with the city Grandview Heights, they are trying to make some of the units more "affordable". 
  • The lots are already zoned commercial

It is SO much worse. It had a lot of charm before, some real architectural interest and nice historical references in its facade. Now it's just another awful box (and some commissioners LIKED the new design BETTER?!)

Edited by jebleprls22

  • 1 month later...

The Edington at 1580 West 1st (Sat. 7-18-20)

jfggR9.jpg

 

jfgIxo.jpg

 

A rendering of the 3 story mixed use condominium building 

First+Ave.jpg?format=1500w

 

Grandview Crossing from C Ray Buck Park

jfgRIC.jpg

 

From Douglas Street

jfgTB5.jpg

 

From a parking lot at Grandview Ave and Dublin Rd

jfgtFv.jpg

 

jfgr72.jpg

  • 5 weeks later...

Grandview mid-rise proposal sparks debate among neighbors

 

1229-grandview-ave*750xx1532-862-65-0.pn

 

The residents support development, they insist, and they don't like what's there now. But they also don't want a monolith that, as one resident put it, "you can hit with a paper airplane from my kids' sandbox."

 

More below:

https://www.bizjournals.com/columbus/news/2020/08/18/grandview-mid-rise-proposal-sparks-debate-among-ne.html

"You don't just walk into a bar and mix it up by calling a girl fat" - buildingcincinnati speaking about new forumers

"The residents support development, they insist, and they don't like what's there now. But they also don't want a monolith that, as one resident put it, "you can hit with a paper airplane from my kids' sandbox."

 

Omg this quote hurt me. No one tell him about the house that's next to his house. Being able to throw a paper airplane from a sandbox to the building next door is kinda Grandview's thing.

12 minutes ago, Zyrokai said:

"The residents support development, they insist, and they don't like what's there now. But they also don't want a monolith that, as one resident put it, "you can hit with a paper airplane from my kids' sandbox."

 

Omg this quote hurt me. No one tell him about the house that's next to his house. Being able to throw a paper airplane from a sandbox to the building next door is kinda Grandview's thing.

How about this quote:

 

"We would live in a solar eclipse from the shadow of that building," said Travis Ulmer, an ER physician who lives on Broadview.

 

A SOLAR ECLIPSE!!!

So many trees on that part of Broadview that you live in a solar eclipse 7 months a year 

  • 4 weeks later...

Grandview Crossing (Sun. 9-13-20)

00dtCP.jpg

 

From Douglas Street

00d1Sm.jpg

  • 4 weeks later...

The Edington at 1580 West 1st (Sun. 10-11-20)

0TAwJF.jpg

Grandview Crossing (Sat. 10-17-20)

0kgCvZ.jpg

 

The Edington

0kg6VK.jpg

The saga continues!

 

https://www.thisweeknews.com/story/news/local/grandview-heights/2020/10/23/crossley-development-offers-revised-plan-grandview-avenue-project/3730958001/?fbclid=IwAR1r8sAIlVdXD38W7jebSdq57VG4IE0sre40j9N-TDBoABC07Y0D0sz5yWI

 

a914612e-5411-4f16-82c9-4e8e069b0c91-102

 

Still a whole lot of neighbor push back, but it sounds like they've made adjustments so they longer need a variance for the setback and they got rid of a curb cuts. So hopefully this moves forward!

5 hours ago, futureman said:

The saga continues!

 

https://www.thisweeknews.com/story/news/local/grandview-heights/2020/10/23/crossley-development-offers-revised-plan-grandview-avenue-project/3730958001/?fbclid=IwAR1r8sAIlVdXD38W7jebSdq57VG4IE0sre40j9N-TDBoABC07Y0D0sz5yWI

 

a914612e-5411-4f16-82c9-4e8e069b0c91-102

 

Still a whole lot of neighbor push back, but it sounds like they've made adjustments so they longer need a variance for the setback and they got rid of a curb cuts. So hopefully this moves forward!

It looks maybe a bit better here than the last proposal. It is not as nice as the first proposal but it is inoffensive and unproblematic like this so I hope they can just get it approved and move forward with it at this point as you stated.

  • 4 weeks later...

Grandview Crossing making some progress. I hope Dublin rd (33) sees some development between Grandview ave and Fifth ave. There’s a lot of potential for some nice mixed use mid rise projects along that stretch. Also does anyone know when the quarry trails park is supposed to be completed. Specifically the park portion with the bike trails, rock climbing, etc?

9B692C72-07F3-4799-89ED-F30054575784.jpeg

  • 1 month later...
35 minutes ago, futureman said:

"Planning commission unanimously rejects Grandview Avenue redevelopment proposal" - Looks likely it's dead, but we'll see ...

 

https://www.thisweeknews.com/story/news/local/grandview-heights/2020/12/18/planning-commission-unanimously-rejects-grandview-avenue-redevelopment-proposal/3945230001/

It’s funny that they say they want something great there, but don’t give any ideas to what that is. It’s not easy for developers to build a 2 story building and make their money back. These commissions are all trash and need to have less power. 

I was just taking a Streetview tour of the commercial area of Grandview Ave and was noticing that the Spencer Research buildings and parking lot on the east side of the street really put a damper on the otherwise urban feel of the street.  Does anyone know if there have been any redevelopment proposals for the site?  It could really use a large mixed-use building.

I haven't heard anything. That building is reviled here on UO for sure. I don't know if the community doesn't like it; when I lived and worked in the area nobody brought it up. I don't know if people in the vicinity are all that savvy about that kind of stuff, unlike UO users or developers.

On 12/22/2020 at 8:07 PM, jeremyck01 said:

I was just taking a Streetview tour of the commercial area of Grandview Ave and was noticing that the Spencer Research buildings and parking lot on the east side of the street really put a damper on the otherwise urban feel of the street.  Does anyone know if there have been any redevelopment proposals for the site?  It could really use a large mixed-use building.

 

I think the issue with that lot is that is reallllllly shallow. It's not big enough to build much on while having enough of a setback from nearby residential units. Still, such a waste was right there! Even if it was just a one story commercial strip with little to know setback from the street would make a big difference. I think the biggest issue with the proposed 4 story building that got denied is that there wasn't a a big enough buffer to nearby residential lots. The new four story residential/commercial building on 1st that is under construction does at least have half of it's lot be a parking lot to put some distance between the nearby houses. 

I believe the building 2nd and Grandivew ave is a former gas stations, so you might have to deal with some contaminated soil as well.

  • 3 weeks later...

Grandview Crossing (Sat. 1-9-21)

0fmzM3.jpg

 

0fmldF.jpg

 

0fmHjr.jpg

 

0fm7P7.jpg

 

0fmp4b.jpg

 

The Edington

0fmSh0.jpg

 

0fmn6D.jpg

On 5/28/2019 at 3:32 PM, Columbo said:

^ Here are some visuals of this Grandview Heights school building project from a school district presentation shown at https://www.thisweeknews.com/assets/pdf/OH3114741.PDF

 

An aerial overview of the Grandview Heights High School building, the Edison/Larson building and the kindergarten annex building located between 1st Avenue and 3rd Avenue.  The high school football field is also visible north of 3rd Avenue in this aerial:

47924915503_4c6908f23d_b_d.jpg

 

The Grandview Heights High School building opened in 1923.  This is a view of its front entrance from 3rd Avenue:

47959860153_fe1db90fca_b_d.jpg

 

 

Overview of the school buildings involved in this construction project:

47924797186_e905c50a67_b_d.jpg

 

 

Overview of the new construction and renovation involved in this project:

47924755487_823fe523d8_b_d.jpg

 

 

 

Overview of the building massing after the new grades 4-8 (middle school) building is finished and the existing Edison/Larson building and the kindergarten annex building are demolished:

47924750387_44162d2d01_b_d.jpg

 

 

 

Site plan of the area between 1st Avenue and 3rd Avenue after the new grades 4-8 building is finished and the existing Edison/Larson building and the kindergarten annex building are demolished.  This option would reopen Fairview Avenue, which is currently blocked off midway between 1st and 3rd:

47924747966_5703acc192_b_d.jpg

 

The Grandview Heights school construction project is on schedule.  The first phase began with a groundbreaking ceremony for a new middle school building on Jan. 11, 2020.  The new middle school building (also called the 4-8 building in the linked article below) is expected to be completed in July 2021.

 

Grandview Heights High School students would then attend class in this new building while the second phase of the project occurs – the renovation of their adjacent high school building.  Students in grades 4-8 would remain in their adjacent building until the high school renovation is completed in December 2022.

 

MORE:  https://www.thisweeknews.com/story/news/local/grandview-heights/2020/12/30/grandview-heights-schools-2021-facilities-project-pandemic-concerns-carry/3993850001/

Wonder if the reconstruction of Grandview's schools will account for all of the new people that Grandview Yard and Grandview Crossing will be drawing into the district? It would be ironic if these buildings are completed, only to need trailers 6 months to a year later to accommodate an unanticipated influx of new students.

14 minutes ago, NEOBuckeye said:

Wonder if the reconstruction of Grandview's schools will account for all of the new people that Grandview Yard and Grandview Crossing will be drawing into the district? It would be ironic if these buildings are completed, only to need trailers 6 months to a year later to accommodate an unanticipated influx of new students.

 

Most of the people living in Grandview Yard don’t have kids. The entire development might add about 12 kids to the entire district, and that’s not an exaggeration. 

And from what I can tell, the single family homes being built there are alot of YPs who aren't really they type for kids or empy nesters downsizing from the suburbs. Several have actually been sold to Nationwide execs who don't want to commute anymore (pre-pandemic)

  • 2 months later...

The Edington at 1580 West 1st (3-29-21)

I781Nb.jpg

 

Grandview Crossing

I780kv.jpg

 

I78ia2.jpg

 

Grandview Heights Highschool renovation

I78t4T.jpg

 

I78rrz.jpg

 

 

  • 2 months later...

For those on insta, @Thrivecompanies posted about a new concept going into Grandview Crossing. Looks like it’s gonna be a market & bar. Renderings look pretty cool to me. 
 

Still cannot for the life of me figure out why I can’t add photos on here. Sorry for those not on insta. 

22 minutes ago, smjjms said:

For those on insta, @Thrivecompanies posted about a new concept going into Grandview Crossing. Looks like it’s gonna be a market & bar. Renderings look pretty cool to me. 
 

Still cannot for the life of me figure out why I can’t add photos on here. Sorry for those not on insta. 

 

35FD6AFA-1A30-4259-9FAA-CC5F617AB7C4.jpeg

44678A72-EA54-49B3-B22D-6DBE4F96CCFF.jpeg

9883D83B-7858-44E2-BA74-3087CA5083C8.jpeg

EAA6BD3E-AFBA-4069-A725-98023473578F.jpeg

1 hour ago, smjjms said:

Still cannot for the life of me figure out why I can’t add photos on here. Sorry for those not on insta. 

 

I believe there is a post minimum in order to add pics (keeps away spammers).  So keep posting!

"You don't just walk into a bar and mix it up by calling a girl fat" - buildingcincinnati speaking about new forumers

26 minutes ago, ColDayMan said:

 

I believe there is a post minimum in order to add pics (keeps away spammers).  So keep posting!

 

So he should spam this thread to prove he's not spam ;)

No comment.

"You don't just walk into a bar and mix it up by calling a girl fat" - buildingcincinnati speaking about new forumers

BMW Financial Services picks Grandview Crossing for new home

 

BMW Financial Services will be relocating to Grandview Crossing.

 

The company Friday told Columbus Business First it will be taking 122,000-square-feet of space spread across four floors in an office building under construction at the development, which is split between Columbus and Grandview Heights.

...

The first phase of the nearly 60-acre Grandview Crossing development is expected to open this fall, with 310 apartments and half of the project's parking capabilities (about 677 spaces). Construction on another 347 units will begin in the next 60 to 90 days.

 

Other tenants on the site will include a daycare and a to-be-named market concept that would collect multiple vendors under one roof similar to the North Market for use by residents, office tenants and visitors.

 

Plans also include a 3.5-acre public park.

 

More below:

https://www.bizjournals.com/columbus/news/2021/06/18/bmw-financial-services-picks-grandview-crossing-fo.html

 

f8222e41-8d2a-411a-836d-8305c94f5690-w

"You don't just walk into a bar and mix it up by calling a girl fat" - buildingcincinnati speaking about new forumers

^Interesting. I worked on their first office on Blazer near Tuttle Mall in the mid 90s. I think they’ve moved a couple of times since

The Edington at 1580 West 1st (6-19-21)

CLB-6-19-21-104.jpg

 

CLB-6-19-21-103.jpg

 

PXL-20210619-205115051.jpg

 

Grandview Heights Highschool renovation and expansion

CLB-6-19-21-105.jpg

On 6/18/2021 at 5:30 PM, Pablo said:

^Interesting. I worked on their first office on Blazer near Tuttle Mall in the mid 90s. I think they’ve moved a couple of times since

Seems like if they can't commit to a suburban location they should just head downtown...

Yeah that way the local economy isn't so unbalanced in favor of people who live in Dublin/Worthington/Westerville.

  • 1 month later...
On 6/16/2021 at 3:00 PM, VintageLife said:

 

35FD6AFA-1A30-4259-9FAA-CC5F617AB7C4.jpeg

44678A72-EA54-49B3-B22D-6DBE4F96CCFF.jpeg

9883D83B-7858-44E2-BA74-3087CA5083C8.jpeg

EAA6BD3E-AFBA-4069-A725-98023473578F.jpeg

An update on the market from Business First:

 

Thrive Cos. readies to start construction on The Collective Market at Grandview Crossing
 

“Thrive Cos. is set to begin construction next month on a community market at its Grandview Crossing development.

The Collective Market will feature 10-12 food vendors and a “large bar,” Thrive CFO Joel Lillysaid. No tenants have been signed yet, but Lilly said the firm has had conversations with food vendors from both the North Market and its Bridge Park outpost, although this market is not affiliated with either.”

 

The article also mentioned the next phase of apts is set to begin construction in the coming weeks. 
 

https://www.bizjournals.com/columbus/news/2021/08/03/grandview-crossing-construction-collective-market.html?ana=e_colum_bn_editorschoice_editorschoice&j=90567114&t=Breaking News&mkt_tok=NjczLVVXWS0yMjkAAAF-rKJT4WOzK5AJwGU2EOxMdwdZR1-y9pPM6-FiycB0g5JMnfiZZd9wakiNyOwJuVnC6tvXtfzqh44irsv-tp2PdaMA71UqQz189mRjfQVyPXoI4wyBhmI

  • 3 weeks later...

Grandview Yard-Adjacent Development Taking Shape

 

A new mixed-use development is taking shape across the street from Grandview Yard.

 

Currently under construction, the project will bring another 260 apartments, 25,000 square feet of commercial space and more than 400 parking spaces to the area.

 

The seven-acre site is located on the south side of Goodale Boulevard, between Bobcat Avenue and Yard Street (each of which is being extended across the street).

 

More below:

https://www.columbusunderground.com/grandview-yard-adjacent-development-taking-shape-bw1/

 

Tri-W-Goodale-3-1-1150x550.jpg

"You don't just walk into a bar and mix it up by calling a girl fat" - buildingcincinnati speaking about new forumers

6 minutes ago, ColDayMan said:

Grandview Yard-Adjacent Development Taking Shape

 

A new mixed-use development is taking shape across the street from Grandview Yard.

 

Currently under construction, the project will bring another 260 apartments, 25,000 square feet of commercial space and more than 400 parking spaces to the area.

 

The seven-acre site is located on the south side of Goodale Boulevard, between Bobcat Avenue and Yard Street (each of which is being extended across the street).

 

More below:

https://www.columbusunderground.com/grandview-yard-adjacent-development-taking-shape-bw1/

 

Tri-W-Goodale-3-1-1150x550.jpg

I drove by this yesterday and the area sure is changing for the better-construction all over the place there-and it was good to see.

 

I had not been there in a while and felt like a tourist or something...gawking at everything lol.

 

The White Castle development was looking really good too. So different from what it used to be. People were even using the big bikeway ramp next to the freeway-and people as in more than one group. 

Edited by Toddguy

On 8/25/2021 at 3:46 PM, ColDayMan said:

Grandview Yard-Adjacent Development Taking Shape

 

A new mixed-use development is taking shape across the street from Grandview Yard.

 

Currently under construction, the project will bring another 260 apartments, 25,000 square feet of commercial space and more than 400 parking spaces to the area.

 

The seven-acre site is located on the south side of Goodale Boulevard, between Bobcat Avenue and Yard Street (each of which is being extended across the street).

 

More below:

https://www.columbusunderground.com/grandview-yard-adjacent-development-taking-shape-bw1/

 

Tri-W-Goodale-3-1-1150x550.jpg

 

The Crew's twitter account posted this aerial view of the LDC. It gives a nice view of the construction progress on this project so far.

 

E90dmhPXIAMNjYt?format=jpg&name=4096x409

I hope they repost this picture when the buildings around the stadium are complete. When are those scheduled to break ground?

1 hour ago, wpcc88 said:

I hope they repost this picture when the buildings around the stadium are complete. When are those scheduled to break ground?

Last I heard, they're supposed to break ground this fall.

On 8/30/2021 at 4:14 PM, Luvcbus said:

Last I heard, they're supposed to break ground this fall.

It's going to be a crazy busy Fall construction season in this city! Going to see so much progress on dozens of projects before winter hits I think.

On 8/30/2021 at 12:00 PM, cbussoccer said:

 

The Crew's twitter account posted this aerial view of the LDC. It gives a nice view of the construction progress on this project so far.

 

E90dmhPXIAMNjYt?format=jpg&name=4096x409

From that perspective it looks taller than anything they've built in Grandview Yard [proper]. The 828 condo building was... 8 stories? Or was that only 6, too? Hopefully whatever they're building on that new parcel is more in the vein of the south end than the retail outparcel north end... Would be nice to see some more height on the rest of this new southern extension