^ yeah that is what surprized me the most when i first saw it, the concave curve in the floor plates. i took it as a sign of quality as well.

 

we just have to realize than when it gets toward to the top construction is going slow way down again as it jenga's back up. so it will probably take awhile to top out.

  • 4 weeks later...

a billlleeeon dollars in sales - per bloomberg news:

 

The foundation for the planned 60-story tower was poured in mid-2008, just before the collapse of Lehman Brothers Holdings Inc. Alexico halted deals and construction for more than four years, said Izak Senbahar, the company’s president.

 

Now, of the 145 units in the building, designed to look like a stack of delicately balanced blocks, only eight remain. A 7,800-square-foot duplex penthouse sold for $47 million.

 

The project “just hit a nerve where a lot of downtown people wanted to upgrade,” Senbahar said. “They needed a larger space, they wanted views, they needed a doorman and a garage.”

 

About 75 percent of the buyers were New Yorkers, said Senbahar, who initially assumed that much of the interest in the tower would come from overseas.

 

“Local people really grabbed it before we could do a marketing campaign overseas,” he said.

 

6BEB706A-8950-4B8A-A02E-13E223DB3F45_zpsh1rrc0nv.jpg

 

  • 3 months later...

jenga!

 

28C15E91-F6B5-41E0-9670-DD21796A3AAD_zpstzhfw8xd.jpgC5205EB8-7360-4B77-A2CA-E796CF89BC49_zpsikucbbre.jpg

 

43B58E8D-CEBE-4A9F-B71B-1320F496D183_zpsx5nlj58k.jpgFB321537-8008-4612-9760-76E7133538D9_zpsl2e6gmhz.jpg

 

  • 9 months later...

rocker pete wolf enjoys from 56 leonard from hoboken!

 

6A7EAB4E-736C-451F-807C-80F8305003AA_zpsaxbilayb.jpgEE2CEFE2-5DC2-47D4-B752-289CB83B7FD8_zpsyd72otu3.jpg

 

more:

 

A98986AC-450F-4324-876E-0E8F7D8CC7E5_zpsvrkqgmul.jpgB6407A2F-EDD9-4A08-872C-3205D8596D78_zpssaiamw52.jpg

 

BFBE3F2D-567F-4524-ABFE-0FFA30E275B5_zpsimzpr1kn.jpg5D8C4214-3ABC-4292-B748-13B385FD1499_zpsbeht7pp6.jpg

  • 3 years later...
  • 1 month later...

although its been plagued by construction problems, last month i saw encouraging signs the bean is on its way.

 

 

0532949D-5B22-4BC3-938C-C0DFDC2E9D38_zps

 

1FB26E30-DCEB-4A53-B569-9B19EAD58EB9_zps

 

F6A802B2-CEAE-47CF-A93C-670AF6B688FC_zps

 

33C0B804-2327-4608-862B-F1103C37B706_zps

 

ADAB5809-A5FE-4603-AB14-E9F1BC3A7EAC_zps

 

DE64DB72-CD55-466B-97CE-32796098D106_zps

 

ED9A85C8-D6FE-4166-9C1A-7A228BD70615_zps

 

7C2A19C4-05DB-41A3-9CD4-47D6D6035B3A_zps

 

  • 2 years later...
  • 2 weeks later...

here is the jenga tower squished bean construction progress i saw -- from a week or so ago.

 

i think these were the very last pics from my crappy old iphone6 thank god lol.

 

-- if you streetview church street and leonard street intersection you can see the setting better.

 

 

spacer.png

 

spacer.png

 

spacer.png

 

spacer.png

 

spacer.png

  • 5 months later...
  • 7 months later...

bean news — with pics on the link:

 

 

 

The Bean will be finished before the end of the year

 

November 3, 2022 • Arts & Culture

 

 

Anish Kapoor’s silver bean, which has been under construction at 56 Leonard — the Jenga building — since February 2019, will be finished before the end of the year.

 

I am not sure this will give the residents above and across the street much comfort — the jack hammering lately has been a bit rough — but it is exciting to hear.

 

The sculptor’s team installed the first of 45 sections back inNovember 2019. And while things seemed to be chugging along (the sections were stored locally and installed piece by piece), covid put a halt on all of it. It remained half finished until September 2021, when the team was able to travel from the UK to get the job done.

 

 

more:

https://tribecacitizen.com/2022/11/03/the-bean-will-be-finished-before-the-end-of-the-year/

On 11/11/2022 at 7:59 PM, mrnyc said:

bean news — with pics on the link:

 

 

 

The Bean will be finished before the end of the year

 

November 3, 2022 • Arts & Culture

 

 

Anish Kapoor’s silver bean, which has been under construction at 56 Leonard — the Jenga building — since February 2019, will be finished before the end of the year.

 

I am not sure this will give the residents above and across the street much comfort — the jack hammering lately has been a bit rough — but it is exciting to hear.

 

The sculptor’s team installed the first of 45 sections back inNovember 2019. And while things seemed to be chugging along (the sections were stored locally and installed piece by piece), covid put a halt on all of it. It remained half finished until September 2021, when the team was able to travel from the UK to get the job done.

 

 

more:

https://tribecacitizen.com/2022/11/03/the-bean-will-be-finished-before-the-end-of-the-year/

Cool beans

  • 4 weeks later...

hard at work yesterday

at the beanery —

 

 

spacer.png

 

Just couldn't let Chicago have a bean monopoly...

On 12/10/2022 at 10:30 AM, JohnSummit said:

 

Just couldn't let Chicago have a bean monopoly...

 

its because anish kapoor aka the beanchitect lives in the building.

  • 1 month later...

more baby beanie news & pix via the local tribeca citizen:

 


The Bean, revealed
February 1, 2023 • Arts & Culture, Photo Essay

 

 

More back story here, but for your viewing pleasure, some reflections (get it?) on the Anish Kapoor sculpture dba The Bean at 56 Leonard. An official name will be revealed later this season. (Taking suggestions in the comments.) Thanks to J. for the video reveal from above.

 


more:
https://tribecacitizen.com/2023/02/01/the-bean-revealed/

 

spacer.png

 

 

  • 2 weeks later...
  • 1 month later...

i bean by here recently —

 

 

spacer.png

 

spacer.png

 

spacer.png

 